Tender Details

Particulars Details
Title
Micro Piling Work For Embankment Filling At Arm 1 Approach Of Rob Valsad
Description
Provision Of Embankment Filling Support System Micro Piling For Approach Construction Work At Arm 1 Approach Of Rob Valsad On Dfc Ch. 37.523 Ir Ch. 196.443, In Connection With Const Of Wdfc Phase 2,Package Ctp 12 In Bw Sachin To Vaitarana To Sachin.
Organisation Central Public Procurement Portal 2
Tender Id 2023_IRCON_159588_1
Reference
Number
IRCON/3018/DFCCTP12/e Tender/Micro piling/BL/8-469
Tender Fee 10000
EMD 2.27 Lakh
Tender Value -
Place Valsad
Link
View Original Tender Notice

https://etenders.gov.in

Start Date July 06, 2023 21:00
End Date
Expired 11/07/2023

Expired 1195 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Earthwork for raising back filling of top bund and outer side slope embankment filling of ls settled bank of pc ii from km. 4.48 to km. 5.90.

Earthwork for raising back filling of top bund and outer side slope embankment filling of ls settled bank of pc ii from km. 4.48 to km. 5.90.

Read more
Rectification of settlement and restoration of high embankment approach to rob from ch. 115.660 to ch 115.910 lhs of nh 20 and construction of service roads wit cc drains at raisun and padmapur build up areas in the state of odisha

Rectification of settlement and restoration of high embankment approach to rob from ch. 115.660 to ch 115.910 lhs of nh 20 and construction of service roads wit cc drains at raisun and padmapur build up areas in the state of odisha

Read more
In financial year 2026 27 repairing of approach of bridges and culverts located on gohan madhaugarh uncha road and repair of damaged embankment and approach of pahuj river at km 8 .

In financial year 2026 27 repairing of approach of bridges and culverts located on gohan madhaugarh uncha road and repair of damaged embankment and approach of pahuj river at km 8 .

Read more
Const of approach earth filling gravelling at 33 kv ss baghera under aen o and m kekri

Const of approach earth filling gravelling at 33 kv ss baghera under aen o and m kekri

Read more
Leftover miscellaneous work like construction of minor bridges, earth work in filling on embankment, blanketing , retaining wall, boulder backing, & turffing on slope of embankment between madhubani to sagauli section in connection with construction of hajipur-sagauli new rail line project.

Leftover miscellaneous work like construction of minor bridges, earth work in filling on embankment, blanketing , retaining wall, boulder backing, & turffing on slope of embankment between madhubani to sagauli section in connection with construction of hajipur-sagauli new rail line project.

Read more
Surf wk incl constr of subgrade, gsb, wbm, dbm , bc, p/coat, t/coat, hard shoulder and moorum filling on approach rd-2 from km 0 to km 5.531 and approach rd-3 from km 0 to km 4.835 of manipur river (west bank near bp-47) to bp-50 in manipur state

Surf wk incl constr of subgrade, gsb, wbm, dbm , bc, p/coat, t/coat, hard shoulder and moorum filling on approach rd-2 from km 0 to km 5.531 and approach rd-3 from km 0 to km 4.835 of manipur river (west bank near bp-47) to bp-50 in manipur state

Read more
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)

Read more
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)

Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)

Read more
Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state

Surf work incl constr of subgrade, gsb, wbm, dbm , bc, prime coat, tack coat, hard shoulder and moorum filling on approach rd-1 from kovang to bp-56 from km 0.00 to km 5.00 under 82 rcc/25 brtf/sewak in chandel distt in manipur state

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise