Tender Details
Particulars | Details |
---|---|
Title |
Madurai Division Reconstruction Of Rob No.2 A At Km. 541/500 600 Between Virudunagar And Tiruttangal Stations On Ac Of Railway Electrification By Proposed Construction Of 3 Lane Rob. (Two Packet System)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75999510 |
Reference Number |
08-CECNMS-24-E-417822-II |
Tender Fee | 0 |
EMD | 17.74 Lakh |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75999510/viewNitPdf_4626106.pdf |
Start Date | July 05, 2024 01:17 |
End Date |
26/07/2024 ( Expired 299 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Read moreSupply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Supply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreUpgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConstruction of rob on ramganj mandi jhalawar railway lc no. 3-a/2-e suket pipaliya road km. 8/0 (mdr-109)
Construction of rob on ramganj mandi jhalawar railway lc no. 3-a/2-e suket pipaliya road km. 8/0 (mdr-109)
Read moreConst. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Read moreConstruction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed rob at railway km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreof your Industry type