Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Of Replacing 02 Damaged Poles And Lights On Inner Ring Road Phase 1
|
| Description |
Work Of Replacing 02 Damaged Poles And Lights On Inner Ring Road Phase 1
|
| Organisation | Agra Development Authority | State Govt. and UT |
| Tender Id | 2024_ADAA_980409_2 |
|
Reference Number |
05/E/M/2024-25 |
| Tender Fee | 590 |
| EMD | 2500 |
| Tender Value | |
| Place | Agra Development Authority |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1728044 |
| Start Date | December 09, 2024 18:30 |
| End Date |
Expired
18/12/2024
Expired 577 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreWork regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read moreAnnual operation and prive maintenance works, emergency maintenance work of 220/33 kv gis smart city ranchi for one (1) year
Annual operation and prive maintenance works, emergency maintenance work of 220/33 kv gis smart city ranchi for one (1) year
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRestoration of alligator cracking on agra inner ring road phase 1
Restoration of alligator cracking on agra inner ring road phase 1
Read moreRestoration of alligator cracking on agra inner ring road phase-1
Restoration of alligator cracking on agra inner ring road phase-1
Read moreConstruction work of agra entry gate in phase-1 located on agra inner ring road.
Construction work of agra entry gate in phase-1 located on agra inner ring road.
Read moreWork of replacing street lights installed on circular road.
Work of replacing street lights installed on circular road.
Read moreDeposit-gmc - ekm - street light balance work-replacing of old damaged street lights with new led street lights and poles in govt. medical college campus kalamassery - balance work -general electrical work
Street light balance work-replacing of old damaged street lights with new led street lights and poles in govt.medical college campus kalamassery
Read moreof your Industry type