Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Erection Of New Ht Ohl From F Substation To Central Pump House At Coal Section Of Dudhichua Project For Supplying Uninterrupted Power To Pumps During Monsoon Period
|
| Description |
Erection Of New Ht Ohl From F Substation To Central Pump House At Coal Section Of Dudhichua Project For Supplying Uninterrupted Power To Pumps During Monsoon Period
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_326943_1 |
|
Reference Number |
DCH/EnM/Tender/FLD/24-25/64 |
| Tender Fee | 0 |
| EMD | 39100 |
| Tender Value | - |
| Place | Dudhichua NCL |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338877 |
| Start Date | January 28, 2025 16:30 |
| End Date |
Expired
06/02/2025
Expired 614 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains
Erection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains
Read moreDesign with quality assurance plan, supplying, erecting, testing and commissioning, of electrical work of 132/33kv substation kahurkheda and 33 kv ht line tal. bhusawal, dist.jalgaon. of bodwad parisar irrigation scheme tal.bodawad dist.jalgaon
Design with quality assurance plan, supplying, erecting, testing and commissioning, of electrical work of 132/33kv substation kahurkheda and 33 kv ht line tal. bhusawal, dist.jalgaon. of bodwad parisar irrigation scheme tal.bodawad dist.jalgaon
Read moreErection of ohl c7 from old central substation to mid entry at pureva top of dudhichua project
Erection of ohl c7 from old central substation to mid entry at pureva top of dudhichua project
Read moreShifting erection and dismantling of lt ohl at west section and coal section of dudhichua project.
Shifting erection and dismantling of lt ohl at west section and coal section of dudhichua project.
Read moreDrawing and erection of ht ohl for providing power to ht pumps and drawing and erection of ht ohl in the mine as and when required basis at kamptee patch and inder patch of kamptee sub area for the period of two year at nagpur area.
Drawing and erection of ht ohl for providing power to ht pumps and drawing and erection of ht ohl in the mine as and when required basis at kamptee patch and inder patch of kamptee sub area for the period of two year at nagpur area.
Read moreMaintenance of ht and lt ohl including checking and tightening of jumpers, jungle clearance including uprooting of bush /wood sampling, tree branch trimming etc around ohl before the onof monsoon for period of 02 month in the mine, dudhichua
Maintenance of ht and lt ohl including checking and tightening of jumpers, jungle clearance including uprooting of bush /wood sampling, tree branch trimming etc around ohl before the onof monsoon for period of 02 month in the mine, dudhichua
Read moreTrimming of tree branches along ht and lt ohl in amlohri township area including ht ohl coming from nigahi substation to amlohri township for a period of two years (730 days).
Trimming of tree branches along ht and lt ohl in amlohri township area including ht ohl coming from nigahi substation to amlohri township for a period of two years (730 days).
Read moreTrimming of tree branches along ht and lt ohl in amlohri township area including ht ohl coming from nigahi substation to amlohri township for a period of two years (730 days).
Trimming of tree branches along ht and lt ohl in amlohri township area including ht ohl coming from nigahi substation to amlohri township for a period of two years (730 days).
Read moreRearrangement of lt ohl 440/220v, 4 wire line from quarry 01 substation to workshop by erection of lt ohl under purnadih ocp nk area.
Rearrangement of lt ohl 440/220v, 4 wire line from quarry 01 substation to workshop by erection of lt ohl under purnadih ocp nk area.
Read moreExtension/erection of ht overhead lines of 3.3kv/6.6kv for installation and shifting of ht pumps at section ii (new patch) of rajrappa project for upcoming monsoon
Extension/erection of ht overhead lines of 3.3kv/6.6kv for installation and shifting of ht pumps at section ii (new patch) of rajrappa project for upcoming monsoon
Read moreof your Industry type