Tender Details
Particulars | Details |
---|---|
Title |
Estimate For Restoration Of Damage Direct Outlet At. 122.700 Km Right Side Of Kandi Canal Stage 2.
|
Description |
Estimate For Restoration Of Damage Direct Outlet At. 122.700 Km Right Side Of Kandi Canal Stage 2.
|
Organisation | Government of Punjab |
Tender Id | 2023_WR_110155_1 |
Reference Number |
56 |
Tender Fee | 2000 |
EMD | 28736 |
Tender Value | |
Place | Xen,Kandi Canal Stage2 Division,hoshiarpur |
Link | https://eproc.punjab.gov.in |
Start Date | September 30, 2023 18:30 |
End Date |
09/10/2023 ( Expired 600 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read morePhase-2 - driver and final stage amplifiers for 2 sets of
Phase-2 - driver and final stage amplifiers for 2 sets of
 iter icrf sources
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreReplacement of motors of gates of head and cross regulators installed at km 6.04 jwalapur on upper ganga canal.
Replacement of motors of gates of head and cross regulators installed at km 6.04 jwalapur on upper ganga canal.&#x0d
Read moreReplacement of steel wire ropes on head and cross regulators installed at km. 6.04 jwalapur on upper ganga canal.
Replacement of steel wire ropes on head and cross regulators installed at km. 6.04 jwalapur on upper ganga canal.&#x0d
Read moreWork of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.
Work of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.&#x0d
Read moreHiring services 1 number brand new tata 407 gold sfc dcr33hsd 2wd bs6 2 at plm department ps5 noonmati for a period of four years
Hiring services 1 number brand new tata 407 gold sfc dcr33hsd 2wd bs6 2 at plm department ps5 noonmati for a period of four years
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreof your Industry type