Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🚂 Procurement Opportunity: S&T Work For Construction Project 🛠️ The Ministry Of Railways, Central Government, Invites Bids For The Execution Of S&T Work In Connection With The Construction Of A Left Hand Side (Lhs) In Lieu Of An Existing Left Cantilever (Lc) Gate No. 6/C/E In The Jurisdiction Of Jharkhand Government Division (Jgd) Medinipur Main Division (Mmd) In The Muri Durgapur Section (Mdp Grd). 📅 Bid Submission Deadline: July 27, 2024, 12:00 Pm Earnest Money Deposit (Emd): Inr 39200 Interested Bidders Should Review The Complete Tender Documents For Detailed Specifications, Scope Of Work, And Submission Guidelines. Keywords: Ministry Of Railways, S&T Work, Construction, Gate Replacement, Jharkhand Government Division, Medinipur Main Division, Muri Durgapur Section, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Asansol Division: S&Amp T Work In Connection With Construction Of Lhs In Lieu Of Lc Gate No. 6/C/E In Between In Jgd Mmd In Mdp Grd Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75931724 |
Reference Number |
23-SDSTE-ASN-2024-25 |
Tender Fee | 0 |
EMD | 39200 |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75931724/viewNitPdf_4622161.pdf |
Start Date | July 03, 2024 21:42 |
End Date |
27/07/2024 ( Expired 323 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Modification work of 132kv s/c hisar sadulpur tr. line bw loc no. 328 and 329 at railway track crossing between railway tp point 171/3 and 171/4 of hmg-sdlp section as deposit work of ms. railway (mlin/22.14) on labour rate contract basis
Modification work of 132kv s/c hisar sadulpur tr. line bw loc no. 328 and 329 at railway track crossing between railway tp point 171/3 and 171/4 of hmg-sdlp section as deposit work of ms. railway (mlin/22.14) on labour rate contract basis
Read moreBalance work in construction of rob in lieu of level crossing no. 449 at gwalior-dholpur section at the risk and cost of previous agency
Balance work in construction of rob in lieu of level crossing no. 449 at km 1262/02-04 on gwalior-dholpur section at the risk and cost of previous agency
Read moreConstruction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreConstruction and maintenance of various zonal work i/c vvip programmes in bamhori and silwani section under sub division silwani
Construction and maintenance of various zonal work i/c vvip programmes in bamhori and silwani section under sub division silwani
Read moreConstruction and maintenance of various zonal work i/c vvip programmes in raisen, sultanpur and sanchi section under sub division raisen
Construction and maintenance of various zonal work i/c vvip programmes in raisen, sultanpur and sanchi section under sub division raisen
Read moreConstruction and maintenance of various zonal work i/c vvip programmes in section badi bareli, udaipura and deori section under sub division bareli
Construction and maintenance of various zonal work i/c vvip programmes in section badi bareli, udaipura and deori section under sub division bareli
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreZone-1 chhata room no. 53 construction work of damaged drain from sindhi dharamshala to chunni lal house and house no. c-390 to 403 in trans yamuna colony phase-1 and house no. e-100 to e-114 in phase-2 e-block.
Zone-1 chhata room no. 53 construction work of damaged drain from sindhi dharamshala to chunni lal house and house no. c-390 to 403 in trans yamuna colony phase-1 and house no. e-100 to e-114 in phase-2 e-block.
Read moreConstruction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar
Construction of 2-lane rob near lc-80 at railway km 107/140 between bhagega - neem ka thana station on rpc section (on sh-37b) neemkathana bypass near agawadi (job no. crif/1013/rj/2022-23)(epc mode), on epc mode in district sikar
Read moreEngagement of agency(s) for hiring 01 (one) no.120 ft fixed boom type man lifter, one no.135 ft fixed boom type man lifter and two nos.120 ft articulated boom type man lifter along with all other accessories in connection with composite work panipat
Engagement of agency(s) for hiring 01 (one) no.120 ft fixed boom type man lifter, one no.135 ft fixed boom type man lifter and two nos.120 ft articulated boom type man lifter along with all other accessories in connection with composite work panipat
Read moreof your Industry type