Tender Details

Particulars Details
Title
Thanjavur Dist. Madukkur Tp Construction Of Compound Wall In Resource Recovery Park Rear Side At Madukkur Town Panchayat
Description
Construction Of Compound Wall In Resource Recovery Park Rear Side At Madukkur Town Panchayat
Organisation Government of Tamil Nadu
Tender Id 2023_DTP_336048_1
Reference
Number
96/2023A1
Tender Fee 0
EMD 9000
Tender Value
Place Madukkur Town Panchayat
Link https://tntenders.gov.in
Start Date July 06, 2023 14:30
End Date

13/07/2023 ( Expired 703 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Read more
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic

Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&amp#x0d compatibility (emc) testing facility in&amp#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&amp#x0d

Read more
Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex

Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex

Read more
Package-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp

Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun

Read more
Construction of rrm protection wall at new tower no.: 04

Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge

Read more
Construction of buttress wall below the 1065 mb level buttress wall of dep- 14 (20 meter in length) at dep 14 biom kirandul complex

Construction of buttress wall below the 1065 mb level buttress wall of dep- 14 (20 meter in length) at dep 14 biom kirandul complex

Read more
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise