Tender Details
Particulars | Details |
---|---|
Title |
Work Contract For Breakdown Maintenance Of Pressure Parts In 1 X 210 Mw Atps, Mppgcl, Chachai.
|
Description |
Work Contract For Breakdown Maintenance Of Pressure Parts In 1 X 210 Mw Atps, Mppgcl, Chachai.
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 6241 |
EMD | 2.1 Lakh |
Tender Value | |
Place | ATPS Chachai |
Link |
AAAAAAAAAA Login to view |
Start Date | March 19, 2025 23:30 |
End Date |
21/04/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreHiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Read morePerformance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreConsultancy services for accompanying measures- support of mmpcl/discoms in strengthening of mp discoms in operation and maintenance, implementation of an esms (environmental and social management system) and capacity, building, strategic planning an
Consultancy services for accompanying measures- support of mmpcl/discoms in strengthening of mp discoms in operation and maintenance, implementation of an esms and capacity, building, strategic planning and training
Read moreOutsourcing maintennace at ph-1 to ph-4 of mukerian hydel project pspcl talwara punjab
Outsourcing the work of routine, prive maintenance, breakdown maintenance and annual overhauling of generating units, switchyards and other allied equipment through contractor at ph 1 to 4 of mukerian hydel project pspcl talwara pb
Read morePerformance based maintenance contract cost estimate from km. 92.025 to km 158.060 of nh-76 in the state of uttar pradesh
Performance based maintenance contract cost estimate from km. 92.025 to km 158.060 of nh-76 in the state of uttar pradesh
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreIndependent engineer services for development, operations and maintenance of ropeway from sonprayag to kedarnath in the state of uttarakhand on dbfot mode
Independent engineer services for development, operations and maintenance of ropeway from sonprayag to kedarnath in the state of uttarakhand on dbfot mode
Read moreof your Industry type