Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps Ii Mi Circle Bm 600 Mw Unit Ii Boiler Rectification Of Defective Steam Supply Line
|
| Description |
Nctps Ii Mi Circle Bm 600 Mw Unit Ii Boiler Rectification Of Defective Steam Supply Line
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_579677_1 |
|
Reference Number |
CE NCTPS II SE M I O M 83 2025 26 |
| Tender Fee | 0 |
| EMD | 25100 |
| Tender Value | - |
| Place | SE MI NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=692818 |
| Start Date | July 09, 2025 17:30 |
| End Date |
Expired
15/07/2025
Expired 456 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nctps i se mi circle boiler maintenance division specification no 305 25 26
Tangedco nctps i 3x210mw installation of semi dry flue gas desulphurization system
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 26 27 specification no 115 26 27
Nctps i semi circle aoh 2627bm dn unit i renewal of damaged acw line at 0mtr from boiler wall to mill area during annual overhaul 202627
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in 7.9m s panel bend and side water wall tube in boiler 1st pass
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 dismantling cleaning and rectification of defective seal trough seal plates ss woven wire mesh providing patch plate
Mtps i bm unit ii boiler pressure parts aoh 2026 dismantling cleaning and rectification of defective seal trough seal plates ss woven wire mesh providing patch plate
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreSupply of electric steam generator / steam boiler for laundry department, mvid hospital
Supply of electric steam generator / steam boiler for laundry department, mvid hospital
Read moreNctps i se mi circle turbine maintenance division annual overhaul work for the year 26 27 specification no 113 26 27
Nctps i semi circle aoh 2627 tm dn unit i iii dismantling of unit 1 turbine bearing pedestal cover no4 unit 3 turbine bearing cover no2 inspection machining of oil guard sealing rings checking the jack oil hoses and replacement of damaged hoses if an
Read moreNctps i se mi circle turbine maintenance division annual overhaul work for the year 26 27 specification no 114 26 27
Nctps i semi circle aoh 26 27 tm dn unit i axial shift rectification dismantling, inspection and replacement of thrust bearing pads and correcting the axial float of the turbine during aoh for the year 202627
Read moreof your Industry type