Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Execution Of Earthwork In Formation, Construction Of Minor Bridges, Blanketing, P. Way Linking Works Including Supply Of Track Ballast, In Connection With Construction Of Railway Infrastructure At Kotarlia Station, Proposed Ckru, Ckrd Lines Excluding
|
| Description |
Execution Of Earthwork In Formation, Construction Of Minor Bridges, Blanketing, P. Way Linking Works Including Supply Of Track Ballast, In Connection With Construction Of Railway Infrastructure At Kotarlia Station, Proposed Ckru, Ckrd Lines Excluding
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_RITES_165834_1 |
|
Reference Number |
09/OT/22-23/RITES/PU BSP/NTPC-Lara |
| Tender Fee | 21240 |
| EMD | 39.64 Lakh |
| Tender Value | - |
| Place | RITES Ltd, PU-Bilaspur |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | August 28, 2023 15:30 |
| End Date |
Expired
16/09/2023
Expired 1126 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Balance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.
Balance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.
Read moreP.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
Read moreBalance work for dumetra-rourkela steel plant connectivity-execution of earthwork in formation, construction of minor bridges, drains works, p. way linking works, supply of p. way fittings, transportation of p. way materials, supply of ballast, construction of goomties, approach road and other allied works.
Balance work for dumetra-rourkela steel plant connectivity-execution of earthwork in formation, construction of minor bridges, drains works, p. way linking works, supply of p. way fittings, transportation of p. way materials, supply of ballast, construction of goomties, approach road and other allied works.
Read moreBalance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.
Balance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.
Read moreExecution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Read moreJeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Read moreConstruction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Read moreConstruction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i
Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i
Read moreConstruction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division
Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division
Read moreConstruction of 3rd line work including earthwork, blanketing, minor bridges, important bridges and other miscellaneous works for 25.0t of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of madhukunda-damodar section in adra division of south eastern railway on engineering, procurement &
Construction of 3rd line work including earthwork, blanketing, minor bridges, important bridges and other miscellaneous works for 25.0t of indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction and power supply in connection with the 3rd line work of madhukunda-damodar section in adra division of south eastern railway on engineering, procurement &
Read moreof your Industry type