Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing /Dismantling And Erection Of 440 Volt And 550 Volt Over Head Line At Different Location And Break Down Attending Of Safety Purpose Of Akwmc,Under Katras Area
|
| Description |
Repairing 
/Dismantling And 
Erection Of 440 
Volt And 550 Volt 
Over Head Line At 
Different 
Location And Break 
Down Attending 
Of Safety Purpose 
Of Akwmc,Under 
Katras Area
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2024_BCCL_298546_1 |
|
Reference Number |
BCCL/KA/IV/ENM/E-TEN/23-24/496 DT.15.1.2024 |
| Tender Fee | 0 |
| EMD | 2200 |
| Tender Value | - |
| Place | AKWMC KATRAS AREA IV |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309248 |
| Start Date | January 15, 2024 14:30 |
| End Date |
Expired
29/01/2024
Expired 992 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and erection of 6.6 kv over head line 3000 gpm pump ampl north side power provide at akwmc katras area.
Dismantling and erection of 6.6 kv over head line 3000 gpm pump ampl north side power provide at akwmc katras area.
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreTaking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla
Read moreDismantling and erection and repairing of 440 volt and 550 volt over head line at different location and break down attending of safety purpose of akwmc uinder katras area
Dismantling and erection and repairing of 440 volt and 550 volt over head line at different location and break down attending of safety purpose of akwmc uinder katras area
Read moreDismantling and erection and repairing of 440v and 550 v over head line at 04 no. sub-station to filter plant break down attending of safety purpose of akwmc,under katras area
Dismantling and erection and repairing of 440v and 550 v over head line at 04 no. sub-station to filter plant break down attending of safety purpose of akwmc,under katras area
Read more440 volt over head line due to break down attending of (a) ramkanali checkpost to old siding ramkanali (b) aadarsh collony ramkanali of aarc at akwmc under katras area.
440 volt over head 
 line due to break 
 down attending of 
 (a) 
 ramkanali 
 checkpost to old 
 siding ramkanali (b) 
 aadarsh 
 collony 
 ramkanali of aarc 
 at akwmc under 
 katras area.
Read moreMaintenance of over head line 440 volt and 550 volt at different location at ramkanali colliery under akwmc, katras area
Maintenance of over head line 440 volt and 550 volt at different location at ramkanali colliery under akwmc, katras area
Read morePatch repairing of 500kva make-bside 6.6kv 550/440 volt doubl rasio transformer sl.no.4009255 at akwmc katras area
Patch repairing of 500kva make-bside 6.6kv 550/440 volt doubl rasio transformer sl.no.4009255 at akwmc katras area
Read moreof your Industry type