Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: High Tensile Bolts M 12 X 55 Mm 🛠️ The Ministry Of Railways, Specifically The Central Government Ministry/Department, Has Issued A Tender For The Supply Of A Set Of High Tensile Bolts M 12 X 55 Mm. 🔧 📅 Submission Deadline: May 15, 2024, 11:30 Am Interested Suppliers Are Requested To Provide A Complete Deion And Adhere To All The Specifications Outlined In The Tender Document. No Tender Fee Or Earnest Money Deposit Is Required. Keywords: High Tensile Bolts, M 12 X 55 Mm, Procurement, Ministry Of Railways, Central Govt. Ministry/Department, Tender, Mumbai Cst| Particulars | Details |
|---|---|
| Title |
Set Of High Tensile Bolt M 12 X 55 Mm
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106339840 |
|
Reference Number |
85245326A |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/052024/106339840/viewNitPdf_4563628.pdf |
| Start Date | May 08, 2024 17:22 |
| End Date |
Expired
15/05/2024
Expired 880 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Preparation of bathukamma play grounds and painting to statue for bathukamma festival at bheemaram bodrai, komatipalli church in division no.55
Preparation of bathukamma play grounds and painting to statue for bathukamma festival at bheemaram bodrai, komatipalli church in division no.55
Read moreRemoval of water stagnation by laying of swd from ypr kaman to existing pipe culvert at adibatla tcs road in ward 55 adibatla adibatla circle - 15 ghmc.
Removal of water stagnation by laying of swd from ypr kaman to existing pipe culvert at adibatla tcs road in ward 55 adibatla adibatla circle - 15 ghmc.
Read moreDevolopment of park adjacent to community hall at srinivas nagar colony,phase-iii under ganesh nagar-284, jeedimetla circle-55, quthbullapurzone,cmc (item no.1) (completion period 1 month)
Devolopment of park adjacent to community hall at srinivas nagar colony,phase-iii under ganesh nagar-284, jeedimetla circle-55, quthbullapurzone,cmc (item no.1) (completion period 1 month)
Read moreFilling of pot holes with cc patches and stone dust , gravel in various places in division no 55 of municipal corporation karimnagar est. cost of rs. 0.80 lakhs under mgf
Filling of pot holes with cc patches and stone dust , gravel in various places in division no 55 of municipal corporation karimnagar est. cost of rs. 0.80 lakhs under mgf
Read moreLaying of cc road in road no 4,7 and 8 in balreddy nagar under ganesh nagar ward-284, jeedimetla circle-55,qbz,cmc (reserved for st) (item no.6) (completion period 1.5 month)
Laying of cc road in road no 4,7 and 8 in balreddy nagar under ganesh nagar ward-284, jeedimetla circle-55,qbz,cmc (reserved for st) (item no.6) (completion period 1.5 month)
Read moreConstruction of water harvesting structure at various locations in ganesh nagar -284 and padma nagar-285, jeedimetla circle-55,quthbullapur zone, cmc. (reserved for waddara / sagara) (item no.2) (completion period 1 month)
Construction of water harvesting structure at various locations in ganesh nagar -284 and padma nagar-285, jeedimetla circle-55,quthbullapur zone, cmc. (reserved for waddara / sagara) (item no.2) (completion period 1 month)
Read moreLaying of cc road from h.no : 49-411/4/c to 49-403/7/c at bapu nagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (item no.3) (completion period 1.5 month)
Laying of cc road from h.no : 49-411/4/c to 49-403/7/c at bapu nagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (item no.3) (completion period 1.5 month)
Read moreLaying of cc road from 49-128/2/b to 49-128/2/a at cherukupally colony, padma nagar phase ii, under padma nagar-285, jeedimetla circle-55,qpz, cmc (item no.4) (completion period 1.5 month)
Laying of cc road from 49-128/2/b to 49-128/2/a at cherukupally colony, padma nagar phase ii, under padma nagar-285, jeedimetla circle-55,qpz, cmc (item no.4) (completion period 1.5 month)
Read moreLaying of cc road at a)shivalayam ( opposite hindu graveyard) at padma nagar and b) h.no : 49-243/1/a to shop no 49/243 at balreddynagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (reserved for sc) (item no.5) (completion period 1.5 month)
Laying of cc road at a)shivalayam ( opposite hindu graveyard) at padma nagar and b) h.no : 49-243/1/a to shop no 49/243 at balreddynagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (reserved for sc) (item no.5) (completion period 1.5 month)
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for begusarai-samastipur road (sh-55) 6-lane (3-lane on each side) at one location in the state of bihar
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for begusarai-samastipur road (sh-55) 6-lane (3-lane on each side) at one location in the state of bihar
Read moreof your Industry type