Title
Dismantling Of One Span Lt / Lighting Overhead Line And Laying Of Power Cable In Ground For Removing Of Hindrance For Laying Of Rail Track For Mechanized Siding/ New Silo Of Dipka Expansion Project.
Description
Dismantling Of One Span Lt / Lighting Overhead Line And Laying Of Power Cable In Ground For Removing Of Hindrance For Laying Of Rail Track For Mechanized Siding/ New Silo Of Dipka Expansion Project.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_323937_1
Reference
Number
SECL/GM(M)/DEP/GM(EnM)/ e-tender/24-25/03 dtd-21/12/24
Tender Fee 0
EMD 800
Tender Value
Place Dipka Expansion Project, Dipka Area
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335790
Start Date December 24, 2024 15:30
End Date

03/01/2025 ( Expired 156 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply, installation, testing and trial for replacement of old 415 v lt power distribution panels installed for mains, dg power supply in b1 b2 c and d blocks and 415 v lt main panel installed in substation with new one in the cmpdi ri-7 colony

Supply, installation, testing and trial for replacement of old 415 v lt power distribution panels installed for mains, dg power supply in b1 b2 c and d blocks and 415 v lt main panel installed in substation with new one in the cmpdi ri-7 colony

Read more
Construction of foundation/ platform for 06 nos ht pump (1000gpm), 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug

Construction of foundation/ platform for 06 nos ht pump (1000gpm), 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug

Read more
Erection of 415 volt- 4 wire overhead line for providing power supply to sirki co-operative school at gandhinagar rehab site and replacement of damaged cable for revival of lighting along the road from sirki chowk to shramik chowk under dipka area.

Erection of 415 volt- 4 wire overhead line for providing power supply to sirki co-operative school at gandhinagar rehab site and replacement of damaged cable for revival of lighting along the road from sirki chowk to shramik chowk under dipka area.

Read more
Dismantling and re loaction of lt overhead line nearby old view point towards new view point in the mines under sonepur bazari project.

Dismantling and re loaction of lt overhead line nearby old view point towards new view point in the mines under sonepur bazari project.

Read more
Repairing and maintenance of drinking water pumps , and valves including maintenance of pipe line at workshop, railway siding , ntpc siding , dozer section ,old silo and new silo of expansion project at dipka area.

Repairing and &#x0d maintenance of drinking &#x0d water pumps , and valves &#x0d including maintenance of &#x0d pipe line at workshop, &#x0d railway siding , ntpc &#x0d siding , dozer section ,old &#x0d silo and new silo of &#x0d expansion project at &#x0d dipka area.

Read more
Spl repair replacement of lt panels board and coversion of lt overhead line to ug cable and connected work for 1861 unit, provn of geyser against defi in bldg no t 23, t 24a and provn of ups for ot and icu at 162 mh under ge dinjan

Spl repair replacement of lt panels board and coversion of lt overhead line to ug cable and connected work for 1861 unit, provn of geyser against defi in bldg no t 23, t 24a and provn of ups for ot and icu at 162 mh under ge dinjan

Read more
Erection/dismantling of 220v mine lt o/h line conductor, pole and accessories for day-to-day work at destination free locations in mine over a period of one year, to meet production urgency of peocp under hzb area

Erection/dismantling of 220v mine lt o/h line conductor, pole and accessories for day-to-day work at destination free locations in mine over a period of one year, to meet production urgency of peocp under hzb area

Read more
Construction of foundation/ plate from for 06 nos ht pump (1000gpm) and 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug mine

Construction of foundation/ platefrom for 06 nos ht pump (1000gpm) and 06 nos ht pump (1500gpm) and 6 nos lt pumps and laying of haulage track line for shifting of above said pumps in ug at khairaha ug mine

Read more
Extension of overhead line for power supply arrangement in recently installed two-number road motion weighbridge near coal receiving shelter and shivpur end of line number - 4 of phulbasiya siding under magadh ocp, ms area

Extension of overhead line for power supply arrangement in recently installed two-number road motion weighbridge near coal receiving shelter and shivpur end of line number - 4 of phulbasiya siding under magadh ocp, ms area

Read more
Extraction/dismantling of pvc xlpe cable from different places of yard trench and laying same in trench for feeding power to newly installed capacitor bank with apfc panel at madhuban d.g sub-station under block-ii area

Extraction/dismantling of pvc xlpe cable from different places of yard trench and laying same in trench for feeding power to newly installed capacitor bank with apfc panel at madhuban d.g sub-station under block-ii area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise