Particulars | Details |
---|---|
Title |
Annual Maintainance Of Nh 07 To Gangapur Bambarda Donduda Road In Km 0/00 To 9/600 Mdr 62 Tah Hinganghat Dist Wardha.
|
Description |
Annual Maintainance Of Nh 07 To Gangapur Bambarda Donduda Road In Km 0/00 To 9/600 Mdr 62 Tah Hinganghat Dist Wardha.
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1108645_1 |
Reference Number |
2425TN4007 |
Tender Fee | 1090 |
EMD | 10500 |
Tender Value | |
Place | Wardha |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1936108 |
Start Date | October 08, 2024 14:30 |
End Date |
14/10/2024 ( Expired 258 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConsultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.
Read moreWork of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreConsultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Consultancy services for feasibility study and dpr preparation for a.upgradation to 4 lane of nh 42 old nh 219 from km 58 600 to 140 680 palamaneru to krishnagiri border section and b.formation of bypass to madanapalli town on nh42 in the state of ap
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreWidening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Read moreWidening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.