Tender Details

Particulars Details
Title
Eucalyptus Clones ( Soil Ph Value 7.5)
Description
Organisation Forest Department Jammu and Kashmir | undefined
Tender Id GEM/2023/B/3766049
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date August 01, 2023 03:11
End Date
Expired 11/08/2023

Expired 1160 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

M/S JUKESH ENTERPRISES

Contract Value

387500

Tender Status: active
Buyer Name: Vikky Sharma
Department: Forest Department Jammu And Kashmir
Organisation: Social Forestry Department

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 M/S JUKESH ENTERPRISES Make : na Model : EUCALYPTUS CLONES ( SOIL PH VALUE 7.7 ) Title : EUCALYPTUS CLONES 11-08-2023 00:04:37 MII Qualified
2 M/S SHIV SHANKAR TRADERS Make : na Model : EUCALYPTUS CLONES ( SOIL PH VALUE 7.7 ) Title : EUCALYPTUS CLONES 11-08-2023 00:09:21 MII Qualified
3 RAM MURTI TRADERS Make : na Model : EUCALYPTUS CLONES ( SOIL PH VALUE 7.7 ) Title : EUCALYPTUS CLONES 10-08-2023 23:55:20 MII Qualified
4 UMAAHA SOLUTIONS PRIVATE LIMITED Make : NA Model : UNBRANDED EUCALYPTUS CLONES Title : UNBRANDED EUCALYPTUS CLONES 10-08-2023 17:14:06 MII Disqualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 M/S JUKESH ENTERPRISES(MII) Item Categories : EUCALYPTUS CLONES ( SOIL PH VALUE 7.5) 387500.00 L1
2 RAM MURTI TRADERS (MII) Item Categories : EUCALYPTUS CLONES ( SOIL PH VALUE 7.5) 620000.00 L2
3 M/S SHIV SHANKAR TRADERS (MII) Item Categories : EUCALYPTUS CLONES ( SOIL PH VALUE 7.5) 697500.00 L3

Ordered Items & Contract Pricing

Product Brand Model Ordered Quantity Price
EUCALYPTUS CLONES na EUCALYPTUS CLONES ( SOIL PH VALUE 7.7 ) 15500 ₹ 387500.000
Similar Tenders
Dual channel analyzer and spares for ph/conductivity measurement of swas system

Dual channel analyzer and spares for ph/conductivity measurement of swas system

Read more
Supply, erection, testing and commissioning of i) conversion of 132kv 2-ph double circuit line to 3-ph double circuit line (15km) from 220/132kv ss budidampadu to 132/25kv rtss-dornakal by stringing 3rd acsr panther conductor (ii) modification of 2nos.132kv bays from 2-ph to 3-ph at 220/132kv ss budidampadu and (iii) erection of 2nos 132kv metering bays at newly proposed 132/25kv rtss-dornakal in khammam district on turnkey basis

Supply, erection, testing and commissioning of i) conversion of 132kv 2-ph double circuit line to 3-ph double circuit line (15km) from 220/132kv ss budidampadu to 132/25kv rtss-dornakal by stringing 3rd acsr panther conductor (ii) modification of 2nos.132kv bays from 2-ph to 3-ph at 220/132kv ss budidampadu and (iii) erection of 2nos 132kv metering bays at newly proposed 132/25kv rtss-dornakal in khammam district on turnkey basis

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Repairing of auxiliary motors and transformer of ekg5a shovel sl. no.hmb-523/exc-2500 of gvp ph-ii ocp

Repairing of auxiliary motors and transformer of ekg5a shovel sl. no.hmb-523/exc-2500 of gvp ph-ii ocp

Read more
Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation

Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Refilling of carbon dioxide (co2) and nitrogen (n2) gases in the cylinders provided by stpp on value rate contract basis for a period of two years to stpp, jaipur, mancherial, telangana

Refilling of carbon dioxide (co2) and nitrogen (n2) gases in the cylinders provided by stpp on value rate contract basis for a period of two years to stpp, jaipur, mancherial, telangana

Read more
Carrying out certain electrical works, networking , providing of air conditioners units, providing 7.5kva ups ,providing epabx system in the quarter no 10,minister quarters,road no 12 banjarahills, hyderabad. part d:providing 7.5 kva ups

Carrying out certain electrical works, networking , providing of air conditioners units, providing 7.5kva ups ,providing epabx system in the quarter no 10,minister quarters,road no 12 banjarahills, hyderabad. part d:providing 7.5 kva ups

Read more
Dc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis

Dc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise