Tender Details

Particulars Details
Title
Transportation Work Of Fp Cotton Bales And Allied Materials Etc.
Description
Transportation Work Of Fp Cotton Bales And Allied Materials Etc.
Organisation Central Warehousing Corporation | Public Sector Undertakings
Tender Id 5295
Reference
Number
No.CWC/RO-BLR/Busi/Transportation-CCI/2024
Tender Fee 1180
EMD 50000
Tender Value
Place Bangalore Region
Link https://cewacor.nic.in/Document/2024/July/Work_Documents/Applicant_Recno1//CCITPTTENDERDOC_0efe8792-21d7-4194-9062-a2ff621a63d8.pdf
Start Date July 09, 2024 17:30
End Date

22/07/2024 ( Expired 301 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Read more
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more

Supply, delivery and installation overhead pole at para water supply scheme (intake site) and other allied works under pmd, phe dte.

Read more
Provn of watch tower and allied services at af stn wadsar

Provn of watch tower and allied services at af stn wadsar

Read more
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara

Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Round the clock picking, removal of stones, shales, iron pieces and other foreign materials from running coal conveyor belts and at metal detector of coal handling plant, ptpp, parichha

Round the clock picking, removal of stones, shales, iron pieces and other foreign materials from running coal conveyor belts and at metal detector of coal handling plant, ptpp, parichha

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise