Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Refurbishment And Overhaul Of Three 3 M 54 E Club Besha Mechanical Timer M
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5651961 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 07, 2025 21:10 |
| End Date |
Expired
28/01/2025
Expired 628 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Repair and refurbishment of en pump assembly including replacement of impeller and mechanical seal
Repair and refurbishment of en pump assembly including replacement of impeller and mechanical seal
Read moreConstruction of an rcc box culvert (with three cells, each having a 3m x 3m span) over a local drain on the connecting road from gopalpur narendapur to marimai dham in sultanpur district
Construction of an rcc box culvert (with three cells, each having a 3m x 3m span) over a local drain on the connecting road from gopalpur narendapur to marimai dham in sultanpur district
Read moreRefurbishment of civil, electrical and mechanical works for entrance lobby of old and annex building of barc hospital, anushaktinagar, mumbai.
Refurbishment of civil, electrical and mechanical works for entrance lobby of old and annex building of barc hospital, anushaktinagar, mumbai.
Read moreSelection of contractor for supply, installation,testing and commissioning of pathway lighting network including lighting fixtures , underground cabling works with three (03) years comprehensive maintenance at indore residency club, indore
Selection of contractor for supply, installation,testing and commissioning of pathway lighting network including lighting fixtures , underground cabling works with three (03) years comprehensive maintenance at indore residency club, indore
Read moreImpeller key,washer,oil seal,air wheel key,stuffing box,pump bering set,bearing housing bearing bracket fin,angular contact ball bearng,mechanical seal,roller bearing,air wheel,shaft sleeve cv 65200,zinc anode,shaft,oil catcher,shaft sleeve,ac condenser sea water pump,mechanical seal,voltage monitoring relay,timer relay,washer,washer,washer,seeger l ring,pump shaft,lip seal,key,ball bearing,olr1625a,impeller,contactor,mechanical seal
Impeller key,washer,oil seal,air wheel key,stuffing box,pump bering set,bearing housing bearing bracket fin,angular contact ball bearng,mechanical seal,roller bearing,air wheel,shaft sleeve cv 65200,zinc anode,shaft,oil catcher,shaft sleeve,ac condenser sea water pump,mechanical seal,voltage monitoring relay,timer relay,washer,washer,washer,seeger l ring,pump shaft,lip seal,key,ball bearing,olr1625a,impeller,contactor,mechanical seal
Read moreSelection of agency for one-time rectification and comprehensive maintenance of different types of medical equipment and other electro mechanical appliances installed in three canddst laboratory at north bengal medical college.(2nd call)
Selection of agency for one-time rectification and comprehensive maintenance of different types of medical equipment and other electro mechanical appliances installed in three canddst laboratory at north bengal medical college.(2nd call)
Read more35 m motorized three-section flag mast system with integrated hoisting, control & aviation lighting,flag mast civil foundation, structural erection & integrated system installation service,skilled fabrication, rigging, mechanical & electrical installation labour for motorized flag mast sy
35 m motorized three-section flag mast system with integrated hoisting, control & aviation lighting,flag mast civil foundation, structural erection & integrated system installation service,skilled fabrication, rigging, mechanical & electrical installation labour for motorized flag mast sy
Read moreSet of hardware for three phase loco as [set of hardware for three phase loco as per is 1364 (part 1) iso 4014 consists of (1) m 24x120 mm, property class 8.8 for cbc foundation = 12 nos., (2) m 24x90/54 mm, property class 8.8 for cbc rest plate = 12 nos., (3) m 24x70/54 mm, property class 8.8 for draft gear rest plate & hood = 24 nos., (4) m 27x180 mm thread length 115 mm, property class 8.8 for side buffers = 16 nos., (5) m 20x80 mm, property class 8.8 for damper foundation = 8 nos., (6) m 1
Set of hardware for three phase loco as [set of hardware for three phase loco as per is 1364 (part 1) iso 4014 consists of (1) m 24x120 mm, property class 8.8 for cbc foundation = 12 nos., (2) m 24x90/54 mm, property class 8.8 for cbc rest plate = 12 nos., (3) m 24x70/54 mm, property class 8.8 for draft gear rest plate & hood = 24 nos., (4) m 27x180 mm thread length 115 mm, property class 8.8 for side buffers = 16 nos., (5) m 20x80 mm, property class 8.8 for damper foundation = 8 nos., (6) m 1
Read moreAddition/alteration of bldg no p-27 of 54 coy asc sup type d and provn of three phase electric connection at trg area of grc and certain minor work in the area of age b/r-ii and age e/m e/s of ge (west) jabalpur
Addition/alteration of bldg no p-27 of 54 coy asc sup type d and provn of three phase electric connection at trg area of grc and certain minor work in the area of age b/r-ii and age e/m e/s of ge (west) jabalpur
Read moreNanded division: mmr-mue section: supplying and stacking of 50 mm gauge hard and durable machine crushed stone ballast at jalna (j)ballast depot and loading the same into hopper/traffic ballast wagon by mechanical means under aden/j s jurisdiction for completion period 30 (thirty months( including (03)three months mobilization period).
Nanded division: mmr-mue section: supplying and stacking of 50 mm gauge hard and durable machine crushed stone ballast at jalna (j)ballast depot and loading the same into hopper/traffic ballast wagon by mechanical means under aden/j s jurisdiction for completion period 30 (thirty months( including (03)three months mobilization period).
Read moreof your Industry type