Tender Details

Particulars Details
Title
Installation Testing And Commissioning Of 440 Volt Power Distribution System At 3.3 Kv Surface Substation Of Kum A Colliery Under Bankola Area.
Description
Installation Testing And Commissioning Of 440 Volt Power Distribution System At 3.3 Kv Surface Substation Of Kum A Colliery Under Bankola Area.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_331789_1
Reference
Number
ECL/GM/BA/E TENDER/24-25/ENM/467 Dt 08.03.2025
Tender Fee 0
EMD 6100
Tender Value -
Place Kumardihi A Colliery
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343930

Start Date March 08, 2025 23:30
End Date
Expired 18/03/2025

Expired 576 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Maintenance and diversion of 440 v/3.3 kv o.h. lines electrification works at various locations of kuju colliery under kuju area.

Maintenance and diversion of 440 v/3.3 kv o.h. lines electrification works at various locations of kuju colliery under kuju area.

Read more
Works at lakshyania 33/11 kv substation

Construction of 1 no ptr foundation, 1 no vcb and ct plinths and station service transformer, cable box structure, dismantling of old structures, construction of cable trench and electrical erection works at lakshyaniya 33/11 kv substation(2nd call).

Read more
Works at panjipara 33/11 kv substation

Construction of 1 no ptr foundation, 1 no vcb and ct plinths, cable box structure, dismantling of old structures, construction of cable trench, switchyard concreting and electrical erection works at panjipara 33/11 kv substation (2nd call)

Read more
Works at sonapur 33/11 kv substation

Construction of 1 no ptr foundation, 1 no vcb and ct plinths, cable box structure, dismantling of old structures, construction of cable trench, switchyard concreting and electrical erection works at sonapur 33/11 kv substation (2nd call).

Read more
Constructing new 11 kv ug cable from vyttila substation to petta junction

Constructing new 11 kv ug cable from vyttila substation to petta junction

Read more
Ruled register with customized print,33 kv, 440 volt substation daily operation log book -lt register,33 kv, 440 volt indoor substation rmu operation log book register,160 kva dg set engine register,1 by 4th plain pad - 100 sheets in a pad,1 by 4th rule pad - 100 sheets in a pad,1 by 8th plain pad - 100 sheets in a pad,1 by 8th rule pad - 100 sheets in a pad,1 by 8th rule spiral pad - 100 sheets in a pad

Ruled register with customized print,33 kv, 440 volt substation daily operation log book -lt register,33 kv, 440 volt indoor substation rmu operation log book register,160 kva dg set engine register,1 by 4th plain pad - 100 sheets in a pad,1 by 4th rule pad - 100 sheets in a pad,1 by 8th plain pad - 100 sheets in a pad,1 by 8th rule pad - 100 sheets in a pad,1 by 8th rule spiral pad - 100 sheets in a pad

Read more
Annual maintenance of different 11 kv ht incoming and differernt 3.3 kv ht outgoing overhead power lines of jocp for a period of 12 months alongwith the renovation of lightning protection system of main substation, laiyo substation and mines at

Annual maintenance of different 11 kv ht incoming and differernt 3.3 kv ht outgoing overhead power lines of jocp for a period of 12 months along with the renovation of lightning protection system of main substation, laiyo substation and mines at

Read more
Drawl of 33 kv line from ukhra gss to shyamsundarpur colliery for the scheme for bulk power supply at 33 kv with ultimate contract demand of 5900 kva in respect of shyamsundarpur colliery under durgapur division

Drawl of 33 kv line from ukhra gss to shyamsundarpur colliery for the scheme for bulk power supply at 33 kv with ultimate contract demand of 5900 kva in respect of shyamsundarpur colliery under durgapur division

Read more
1.drawing of 1 new 440 v overhead line (500 m) from no.2 pit substation to agent office, kumardhubi colliery, 2. new 550v overhead line (300 m) from no. 2 pit substation to no. 2 pit fan house at kumardhubi colliery, mugma area, ecl.3.a) drawing of n

1.drawing of 1 new 440 v overhead line (500 m) from no.2 pit substation to agent office, kumardhubi colliery, 2. new 550v overhead line (300 m) from no. 2 pit substation to no. 2 pit fan house at kumardhubi colliery, mugma area, ecl.3.a) drawing of n

Read more
Repair and maintenance works by replacing the existing damaged pipe line and septic tank of substation buildings of s.pudur 110 kv ss

Repair and maintenance works by replacing the existing damaged pipe line and septic tank of substation buildings of s.pudur 110 kv ss

Read more
Click Here to Download Dockets
of your Industry type