Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Special Repaires To Vele 1 Vele 2 Dhanwadi Dy And Main Canal Km 69 To 75 Of Hrbc Remaining Work In Mwsip And Other Required Work
|
Description |
Special Repaires To Vele 1 Vele 2 Dhanwadi Dy And Main Canal Km 69 To 75 Of Hrbc Remaining Work In Mwsip And Other Required Work
|
Organisation | CE Tapi Irrigation Development Corporation Jalgaon | State Govt. and UT |
Tender Id | 2024_TIDC_1087728_1 |
Reference Number |
E Tender No 03/02 |
Tender Fee | 2860 |
EMD | 2.03 Lakh |
Tender Value | |
Place | Vele |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1898358 |
Start Date | September 20, 2024 15:40 |
End Date |
27/09/2024 ( Expired 280 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreWork of one time treatment of bypassed portion of dharuhera town on nh 919, ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.
Work of one time treatment of bypassed portion of dharuhera town on nh 919,
 ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreProviding laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur
Providing laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur
Read moreConstruction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreBalance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.
Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram (2nd call)
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreof your Industry type