Tender Details
Particulars | Details |
---|---|
Title |
Construction Rcc Storage Bandhara Vangule Kuvlekar Utaran Tal. Lanja
|
Description |
Construction Rcc Storage Bandhara Vangule Kuvlekar Utaran Tal. Lanja
|
Organisation | Government of Maharashtra |
Tender Id | 2024_RATNA_982010_1 |
Reference Number |
RWSD E TENDER/49/Open/23-24 |
Tender Fee | 1000 |
EMD | 29413 |
Tender Value | |
Place | Executive Engineer RWS ZP Ratnagiri |
Link | https://mahatenders.gov.in |
Start Date | January 10, 2024 23:30 |
End Date |
16/01/2024 ( Expired 503 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreFleet base buildings landside works (fbl)
Fleet base buildings landside works
 (fbl) - construction of fleet base
 buildings and infrastructure,
 equipment supply, installation,
 commissioning, operation and
 maintenance of landside facilities
 at naval base, karwar, karnataka
Read moreConstr of bow string steel arch major bridge
Rfp for construction of bow string steel arch major bridge (2nos) across river iravanjippuzha in the
 kozhikode district of kerala state anakkampoyil kalladi meppadi package i
Read moreSelection of epc contractor for chitrakoot link expressway
Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode
Read moreConstruction of bypass to gangaikonda cholapuram in kallagam to meensurutti section of nh-81 (old nh-227) in tamil nadu on epc mode
Construction of bypass to gangaikonda cholapuram in kallagam to meensurutti section of nh-81 (old nh-227) in tamil nadu on epc mode
Read moreAbilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreof your Industry type