Tender Details

Particulars Details
Title
Hiring Of Consultancy Services Percentage Based Soil Investigation And Survey Work For Provn Of
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2025/B/6585099
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date August 19, 2025 21:16
End Date
Expired 29/08/2025

Expired 408 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 1 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army
Similar Tenders
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri

Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)

Read more
Requirement of civil consultancy items

Requirement of civil consultancy items

Read more
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).

Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).

Read more
Supply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training

Supply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training

Read more
Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call

Construction of rta unit office with driving track at husnabad in siddipet district. sub-work: consultancy services for preparation of (i) soil testing (ii) architectural designs and drawings (iii) structural designs and drawings (iv) mep drawings (v) periodical site visits (vi) submission of architectural as built drawings-2nd call

Read more
Provn of upvc doors at hq cif (r) under age (i) cif (r ).

Provn of upvc doors at hq cif (r) under age (i) cif (r ).

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation

Comprehensive operation and maintenance of 750 kld camus soil bio-technology (sbt) based sewage treatment plant (stp) at mgm hospital, in greater warangal municipal corporation

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Selection of project management consultant to function as state programme management unit (spmu) for monitoring of naksha pilot project of land records & survey

Selection of project management consultant to function as state programme management unit (spmu) for monitoring of naksha pilot project of land records & survey

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise