Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Mtps I M Ii Chp I Bhel Locomotive No 4 Removing The Auxiliary Generator And Overhauling By Replacing Worn Out Bearings Other Spares Etc
|
Description |
Mtps I M Ii Chp I Bhel Locomotive No 4 Removing The Auxiliary Generator And Overhauling By Replacing Worn Out Bearings Other Spares Etc
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_488870_1 |
Reference Number |
SE PA SE M II MTPS I CHP I OT 19 2024 2025 |
Tender Fee | 0 |
EMD | 2000 |
Tender Value | |
Place | MTPS-I |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=580956 |
Start Date | September 27, 2024 18:10 |
End Date |
03/10/2024 ( Expired 274 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreEchp-ii- dismantling and renewal of existing worn out support i beam, tripper chute floor and walkways structures in conveyor-68 by new sh materials
Echp-ii- dismantling and renewal of existing worn out support i beam, tripper chute floor and walkways structures in conveyor-68 by new sh materials
Read moreNctps i se m ii circle echs dn overhauling and reconditioning of worn out failed rotating assembly complete for fluidomat make fluid coupling model sc 12 released from the conveyor bcn 40b
Nctps i se m ii circle echs dn overhauling and reconditioning of worn out failed rotating assembly complete for fluidomat make fluid coupling model sc 12 released from the conveyor bcn 40b
Read moreNctps i se m ii circle ahp dn unit i 2025 26 overhauling bah removal reconditioning renewal of spares testing and commissioning of hydraulic power packs for scrapper feeders
Nctps i se m ii circle ahp dn unit i 2025 26 overhauling bah removal reconditioning renewal of spares testing and commissioning of hydraulic power packs for scrapper feeders
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Read moreNctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Nctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Read moreNctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Nctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Read moreNctps i es circle em i dn s dn i annual maintenance works in generator transformers unit auxiliary transformers and station transformers of unit i ii iii during the annual capital overhauling period for the year 2025 26 at nctps i
Nctps i es circle em i dn s dn i annual maintenance works in generator transformers unit auxiliary transformers and station transformers of unit i ii iii during the annual capital overhauling period for the year 2025 26 at nctps i
Read moreMtps i chp i replacement of damaged worn out obsolete railways track cst sleeper by new psc concrete sleepers with required accessories such as elastic rail clips liners track no 08
Mtps i chp i replacement of damaged worn out obsolete railways track cst sleeper by new psc concrete sleepers with required accessories such as elastic rail clips liners track no 08
Read moreof your Industry type