Tender Details

Particulars Details
Title
Installation, Testing And Commissioning Of Pidws System Using Spare Controller Unit In Beawar Deepawas Section Of Mppl For Covering Most Vulnerable Stretch Under Beawar Jurisdiction.
Description
Installation, Testing And Commissioning Of Pidws System Using Spare Controller Unit In Beawar Deepawas Section Of Mppl For Covering Most Vulnerable Stretch Under Beawar Jurisdiction.
Organisation IndianOil | Central Govt. Ministry/Department
Tender Id 2024_PL_180227_1
Reference
Number
PWJDT24048
Tender Fee 0
EMD 0
Tender Value -
Place WRPL Beawar
Link
View Original Tender Notice

https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=190563

Start Date September 07, 2024 20:30
End Date
Expired 14/09/2024

Expired 763 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Zone-03, ward no. 59, bhagat vihar road construction using cement concrete (cc) covering the stretch from yadav ji house, passing through dr. haresh kushwah house, up to rajveer house

Zone-03, ward no. 59, bhagat vihar road construction using cement concrete (cc) covering the stretch from yadav ji house, passing through dr. haresh kushwah house, up to rajveer house

Read more
Zone-03, ward no. 59, tajnagari phase-02, block 7f-01 road construction using interlocking tiles covering the stretch from bablu house to adil house, and from naeem house to arshad house.

Zone-03, ward no. 59, tajnagari phase-02, block 7f-01 road construction using interlocking tiles covering the stretch from bablu house to adil house, and from naeem house to arshad house.

Read more
Anti erosion work on the right bank of river ganga near n.h.-80 at balapokhar maskaliya of taljhari block under district sahibganj in most vulnerable stretch of 633 meter with construction of 10 nos of stud of 18m length each 60m c/c with 12 m laun

Anti erosion work on the right bank of river ganga near n.h.-80 at balapokhar maskaliya of taljhari block under district sahibganj in most vulnerable stretch of 633 meter with construction of 10 nos of stud of 18m length each 60m c/c with 12 m laun

Read more
Anti erosion work on the right bank of river ganga near n.h.-80 at balapokhar maskaliya of taljhari block under district sahibganj in most vulnerable stretch of 633 meter with construction of 10 nos of stud of 18m length each 60m c c with 12 m launc

Anti erosion work on the right bank of river ganga near n.h.-80 at balapokhar maskaliya of taljhari block under district sahibganj in most vulnerable stretch of 633 meter with construction of 10 nos of stud of 18m length each 60m c c with 12 m launc

Read more
Drainage repair and road construction work using interlocking tiles in ward-19 (defense colony), covering the stretch from podwal medical passing by robinson house up to the gurudwara link gali sachin from rakesh to gangadhar from usha devi to rajesh

Drainage repair and road construction work using interlocking tiles in ward-19 (defense colony), covering the stretch from podwal medical passing by robinson house up to the gurudwara link gali sachin from rakesh to gangadhar from usha devi to rajesh

Read more
Zone-1, chhatta, ward no. 58, kalindi vihar road improvement using hot mix technology, along with the construction of a drainage system and installation of interlocking tiles on the side footpath, covering the stretch from the 80-foot road to the ra

Zone-1, chhatta, ward no. 58, kalindi vihar road improvement using hot mix technology, along with the construction of a drainage system and installation of interlocking tiles on the side footpath, covering the stretch from the 80-foot road to the ra

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise