Particulars | Details |
---|---|
Title |
Major Road Repair Work On Annual Rate Contract Basis Pwd Sub Div Kawai
|
Description |
Major Road Repair Work On Annual Rate Contract Basis Pwd Sub Div Kawai
|
Organisation | PWD - CE AND AS | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 98000 |
Tender Value | |
Place | BARAN |
Link |
AAAAAAAAAA Login to view |
Start Date | July 02, 2025 22:30 |
End Date |
23/07/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Read moreDesign and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road
Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road
Read moreDesign and constrn of 02 nos various span major minor pmt bridges on open fdn with steel superstructure through type steel girder type and 01 nos of sub structure for modular bridge incl ssi incl approach rd at km 75.98, 78.00 and km 82.35 on npd rd
Design and constrn of 02 nos various span major minor pmt bridges on open fdn with steel superstructure through type steel girder type and 01 nos of sub structure for modular bridge incl ssi incl approach rd at km 75.98, 78.00 and km 82.35 on npd rd
Read moreDesign and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc
Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc
Read moreStmc hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29
Short term maintenance contract for hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29 in the state of nagaland in fy 2025-26 percentage rate and work order basis
Read moreWork of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read moreConstruction of 220/132 kv, 160 mva and 132/33 kv, 1x31.5 mva gss at bambloo (district-bikaner) along with 01 no. of 33 kv, 5.43 mvar capacitor bank at 220 kv gss, bambloo and 2x220 kv bays at 220 kv gss seruna work on turnkey basis bn9019002518
Construction of 220/132 kv, 160 mva and 132/33 kv, 1x31.5 mva gss at bambloo (district-bikaner) along with 01 no. of 33 kv, 5.43 mvar capacitor bank at 220 kv gss, bambloo and 2x220 kv bays at 220 kv gss seruna work on turnkey basis bn9019002518
Read moreMajor repairs to cement concrete approach road to head work at water supply scheme at bhatera, balaghat mine.