Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ee/Ws/Grww/Rwps/25 26/E T 08
|
| Description |
Manufacturing, Fabricating, Supply And Installation Of Lt Control Panel For Operation Of Delivery Side 900 Mm Dia. Bfv Against Pump No.1 And 2 At Rwps Iii, Grww.
|
| Organisation | KOLKATA MUNICIPAL CORPORATION | State Govt. and UT |
| Tender Id | 2025_KMC_869807_1 |
|
Reference Number |
EE/WS/GRWW/RWPS/25-26/eT-08 |
| Tender Fee | 0 |
| EMD | 5770 |
| Tender Value | |
| Place | EE/WS/GRWW Office,GRWW,BIDHANGARH |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1956276 |
| Start Date | June 25, 2025 19:30 |
| End Date |
Expired
07/07/2025
Expired 343 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, installation, testing and commissioning of 200 kva transformers and lt panel with allied items at central jail-1, hisar.
200 kva transformers and lt panel with allied items
Read moreInstallation of a control panel and automation system for the operation of equipments installed for water purification in the lake located at yamunotri guest house, new delhi
Installation of a control panel and automation system for the operation of equipments installed for water purification in the lake located at yamunotri guest house, new delhi
Read moreRepairing gear box of screw pump no. 3, supply and installation of cables and cable tray for ptu and control room and repairing of parshal flume, screw pump house at konia mps, varanasi
Repairing gear box of screw pump no. 3, supply and installation of cables and cable tray for ptu and control room and repairing of parshal flume, screw pump house at konia mps, varanasi
Read moreSupply installation testing and commissioning of lt soft starters for ddpl mainline and booster pumping units along with allied panel spares at iocl bangalore terminal devanagonthi
Supply installation testing and commissioning of lt soft starters for ddpl mainline and booster pumping units along with allied panel spares at iocl bangalore terminal devanagonthi
Read moreSupply and supervision of installation, testing and commissioning of 01 no. 33 kv protection panel for 220/132kv sitarganj substation of powergrid
Procurement of 01 no. 33 kv protection panel for transformer-(with automation) for control and protection purpose of to be commissioned tertiary bay for utilization of tertiary winding of 220/132/33kv m/s toshiba make 160 mva transformer at 220/132kv sitarganj substation of powergrid nr-iii region
Read moreRfp for rate contract of 2 years for supply, installation and commissioning of surveillance equipment under abhay command and control project in the state of rajasthan
Rfp for rate contract of 2 years for supply, installation and commissioning of surveillance equipment under abhay command and control project in the state of rajasthan
Read more1) replacement of existing sub- station equipments 2) replacement of lt panels 3) sitc of retro fit emission control device for diesel generators and necessary electrical work at igdtuw, govt of nct of delhi.
1) replacement of existing sub- station equipments 2) replacement of lt panels 3) sitc of retro fit emission control device for diesel generators and necessary electrical work at igdtuw, govt of nct of delhi.
Read moreTender for supply and installation of high resolution thermography camera for 2 no. 132kv ehv substation with 5 year amc (tr-03/2026)
Tender for supply and installation of high resolution thermography camera for 2 no. 132kv ehv substation with 5 year amc
Read moreSet of split pin for pantograph am-12. a consist of 02 items in 20 nos as follows: - (1) 4 x 45 mm cre drg. no-0103sp440 or similar. qty- 10 nos. (2) 3 x 30 mm cre drg. no-0103sp325 or similar. qty- 10 nos.
For complete deion and other details, please refer to tender
Read moreReplacement of damaged end termination kits and re-routing of cable route of pump sjpnl along with 22kv gumma no.1 and 22kv gumma no.2 to provide reliable power supply to lwss gumma in es gumma under esd, hpsebl, mashobra
Replacement of damaged end termination kits and re-routing of cable route of pump sjpnl along with 22kv gumma no.1 and 22kv gumma no.2 to provide reliable power supply to lwss gumma in es gumma under esd, hpsebl, mashobra
Read moreof your Industry type