Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
132k V Ais Substation Package Ss113
|
Description |
132k V Ais Substation Package Ss113 For (A) Extn. Of 110k V Vengatanagar S/S, (B) Supply And Laying Of 110k V Underground Cable From Existing Vengata Nagar S/S To Jipmer S/S, (C) Extn. Of 110/22k V Korkodu Substation Including Supply Of 2 (Two) Nos. 110/22 K V, 25 Mva Power Transformers, (D) Extn Of Kalapet And Thetampakkam Substations, (E) Providing Of New 110 Kv Bus Coupler Isolator At Thondamanatham And Villianur 110/22 Kv Sub Stations Under Consultancy Services To Electricity Department, Puducherry.
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id | 23531 |
Reference Number |
CC/NT/W-AIS/DOM/A02/23/12163 |
Tender Fee | 25000 |
EMD | 0 |
Tender Value | |
Place | Puducherry |
Link | https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=e6593575-2b2d-42aa-b60e-a65e3cf71c11 |
Start Date | December 06, 2023 22:50 |
End Date |
17/01/2024 ( Expired 536 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Read moreEoi for qualifying requirements for single package epc for 3x125 mw tpp at gurha, bikaner dist.(raj)
Eoi for qualifying requirements for single package epc for 3x125 mw tpp at gurha, bikaner dist.(raj)
Read moreLot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india
Read morePower supply and traction works
Supply, erection, testing and commissioning of receiving substation with incoming cabling from grid substation including 25 kv-ac traction cum 33kv auxiliary main sub- stations, 25kv overhead equipment, auxiliary power supply and other works for bsrp
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss seruna (dist - bikaner) on turnkey basis against specification no. rvpn/ehv/bn-9019002516
Construction of 220kv and 132kv transmission lines associated with 220kv gss seruna (dist - bikaner) on turnkey basis against specification no. rvpn/ehv/bn-9019002516
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreP1pd47.2025.licensing of exclusive train wrapping rights on select trainsets and external advertisement on stations of pune metro rail project for a period of 07 years on package basis.
P1pd47.2025.licensing of exclusive train wrapping rights on select trainsets and external advertisement on stations of pune metro rail project for a period of 07 years on package basis.
Read moreMain power plant (mpp) epc package for durgapur thermal power station (1x800mw)
Main power plant (mpp) epc package for durgapur thermal power station (1x800mw)
Read moreof your Industry type