Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Load Testing Of Hydraulic Jack Wheel Changing,Load Testing Of Hydraulic Crane,Load Testing Of Lifte
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2025/B/6260674 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 22, 2025 15:32 |
| End Date |
Expired
12/06/2025
Expired 486 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Out sourcing services for nd testing and hydraulic pressure testing of air receiver tanks on hemm at pkoc,manuguru area.-reg.
Out sourcing services for nd testing and hydraulic pressure testing of air receiver tanks on hemm at pkoc,manuguru area.-reg.
Read moreHydraulic pressure testing of air receiver tanks of air compressors working at gdk-11 incline, rg.1 area
Hydraulic pressure testing of air receiver tanks of air compressors working at gdk-11 incline, rg.1 area
Read moreRepairing of radiator assly of dozer catd11t sl. no. ama00919, wheel dozer 834k sl. no. 749 dozer bd155 sl. no. 13629,13784, bd355 dozer sl. no. 11657, grader bg825 sl. no. 3244, 3253 and radiator assly of escort rt40 crane, uttam 12t crane, dumper b
Repairing of radiator assly of dozer catd11t sl. no. ama00919, wheel dozer 834k sl. no. 749 dozer bd155 sl. no. 13629,13784, bd355 dozer sl. no. 11657, grader bg825 sl. no. 3244, 3253 and radiator assly of escort rt40 crane, uttam 12t crane, dumper b
Read moreOut sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Read moreLiquid chlorine cylinders delivery, fixing and arresting of emergency chlorine gas leakages duly engaging 3 nos of 11 ton gvw cargo vehicles equipped with hydraulic crane to load, unload and transport the chlorine tonners along with skilled and semi skilled labour at various reservoirs chlroination destinations approx 300 nos under the distribution system of hmwssb for a period of two years under central chlorination cell qat wing.
Liquid chlorine cylinders delivery, fixing and arresting of emergency chlorine gas leakages duly engaging 3 nos of 11 ton gvw cargo vehicles equipped with hydraulic crane to load, unload and transport the chlorine tonners along with skilled and semi skilled labour at various reservoirs chlroination destinations approx 300 nos under the distribution system of hmwssb for a period of two years under central chlorination cell qat wing.
Read moreLoad testing of hydraulic jack dor tail,load testing of hydraulic jack dor main,load testing of hyd
Read more
Load testing of hydraulic jack dor tail,load testing of hydraulic jack dor main,load testing of hyd
Read more
Repair and overhauling service - load testing of hydraulic jack; load testing of hydraulic jack; ye
Read more
of your Industry type