Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Construction Opportunity: Compound Wall Erection 🧱 The Ministry Of Railways, Central Government, Invites Bids For The Construction Of Compound Walls In The Jurisdiction Of Aden/Cudappah. The Project Includes The Following Segments: 📏 Kadapa Towards Gtl End: 800 Meters 📏 Kamalapuram: 1000 Meters 📏 Muddanuru: 1000 Meters Bid Submission Deadline: 25/06/2024, 3:00 Pm ⏳ Emd: Inr 267100 Interested Contractors Must Possess The Necessary Qualifications And Experience In Construction Projects Of Similar Magnitude. Detailed Tender Documents Must Be Referenced For Complete Specifications And Project Details. Keywords: Construction, Compound Wall, Ministry Of Railways, Central Government, Infrastructure Project, Tender, Bid Submission, Emd, Kamalapuram, Muddanuru, Kadapa, Aden/Cudappah Jurisdiction| Particulars | Details |
|---|---|
| Title |
Aden/Cudappah Jurisdiction: Construction Of Compound Wall To A Length Of 1000 M At Kadapa Towards Gtl End, Kamalapuram 800meters Length, Muddanuru 1000 Meters Length
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75276738 |
|
Reference Number |
Engg-GTL-South-1600 |
| Tender Fee | 0 |
| EMD | 2.67 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/062024/75276738/viewNitPdf_4581091.pdf |
| Start Date | May 31, 2024 20:29 |
| End Date |
Expired
25/06/2024
Expired 843 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of compound wall for a length of 310 meters at ilango adigal government higher secondary school, muthirapalayam, puducherry
Construction of compound wall for a length of 310 meters at ilango adigal government higher secondary school, muthirapalayam, puducherry
Read moreConveyor system 1000 mm belt width length 1000m with 2x90kw 550v flp electricals,belt conveyor syst
Read more
Pipeline work from jd hotel to tehsildar s residence on bah agra road length 1000 meters
Pipeline work from jd hotel to tehsildar s residence on bah agra road length 1000 meters
Read moreResectioning and raising/strengthening of embankment of balkhul nallah from rd 15 kms to 21 kms at spots (length 1000 meters).
Resectioning and raising/strengthening of embankment of balkhul nallah from rd 15 kms to 21 kms at spots (length 1000 meters).
Read moreConstruction of compound wall for a length of 25 meters in the government backward classes school girls hostel at kundrathur in kancheepuram district.
Construction of compound wall for a length of 25 meters in the government backward classes school girls hostel at kundrathur in kancheepuram district.
Read moreHeavy duty polycholoroprene (neoprene)rubber sheet.size:1000 mm width, 2 mm thick x 10 meters length in rolls as per clw s specn. no.clw/es/r-24/d.
For complete deion and other details, please refer to tender
Read moreSw-i:-aden/cta section- construction of boundary wall shv- 1000 m. hsd- 300 m, cta70 m to avoid encroachment with solid block masonary compound wall with pillars sw-ii:-aden/dvg section:improvements to roads in railway colony
For complete deion and other details, please refer to tender
Read moreMys div:-aden/smet sub div:-construction of boundary wall/compound wall along the track approaches of bdvt & smet station for a length of 1700mtrs.
For complete deion and other details, please refer to tender
Read moreMys div:-aden/mys sub div::-construction of boundary wall/compound wall along the track approaches of hln & has stations for a length of 2800mtrs.
For complete deion and other details, please refer to tender
Read moreChikbanavara - hassan section : sw i : construction of rcc drain for a length of 2.2 km in scattered locations between km 5/500-55/300 in aden/kunnigal section. sw ii : construction of rcc side drain 1000m and ballast retaining wall 1000m in connection with the work of baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreof your Industry type