Tender Details
Particulars | Details |
---|---|
Title |
Implementation Of Fibre Optic Terminal Equipment For Connectivity Of Lkhep Generating Station With The Existing Fiber Optic Network Of Aegcl From 132 Kv Shankardevnagar Gss Aegcl
|
Description |
Implementation Of Fibre Optic Terminal Equipment For Connectivity Of Lkhep Generating Station With The Existing Fiber Optic Network Of Aegcl From 132 Kv Shankardevnagar Gss Aegcl
|
Organisation | Assam Electricity Grid Corporation Ltd | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 3000 |
EMD | 6 Lakh |
Tender Value | |
Place | LKHEP, APGCL, Umrangso |
Link |
AAAAAAAAAA Login to view |
Start Date | July 02, 2025 15:30 |
End Date |
23/07/2025 ( 51 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Implementation of fibre optic terminal equipment for connectivity of lkhep generating station with the existing fiber optic network of aegcl from 132kv shankardevnagar gss aegcl
Implementation of fibre optic terminal equipment for connectivity of lkhep generating station with the existing fiber optic network of aegcl from 132kv shankardevnagar gss aegcl
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConsultancy services for preparation of detailed project report (dpr) for elevated corridor for connectivity from aiims to mahipalpur bypass project with further extension to gurgaon- faridabad road.
Consultancy services for preparation of detailed project report (dpr) for elevated corridor for connectivity from aiims to mahipalpur bypass project with further extension to gurgaon- faridabad road.
Read moreHiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Read moreRfp for appointment of consultant for preparation of dpr to connect the krishna river right bank bund road (from the existing flood pumping station near undavalli) to the downstream of the right bank bund road (up to varadhi) in andhra pradesh
Request for proposal for appointment of consultant for preparation of detailed project report to connect the krishna river right bank bund road (from the existing flood pumping station near undavalli) to the downstream of the right bank bund road (up to varadhi) in andhra pradesh.
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreDesign and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Read moreOutsourcing of routine operation of 220/132kv pithoragarh sub-station with skilled manpower (engineer) for a period of 03 years (36 months) through gem
Outsourcing of routine operation of 220/132kv pithoragarh sub-station with skilled manpower (engineer) for a period of 03 years (36 months) through gem
Read moreof your Industry type