Tender Details
Particulars | Details |
---|---|
Title |
Under District Lucknow, Putty And Painting Work On The Exterior Of The Southern Building/Library Building With Repairs As Required, Lot No 1
|
Description |
Under District Lucknow, Putty And Painting Work On The Exterior Of The Southern Building/Library Building With Repairs As Required, Lot No 1&Amp#X0d
|
Organisation | Director Cum Chief Engineer RED | State Govt. and UT |
Tender Id | 2025_REDUP_1021968_1 |
Reference Number |
2246/EE RED LUCKNOW/24-25 Dt 07/03/2025 |
Tender Fee | 950 |
EMD | 31000 |
Tender Value | |
Place | LUCKNOW |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1844364 |
Start Date | March 25, 2025 14:30 |
End Date |
07/04/2025 ( Expired 63 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Read moreSurface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read morePainting work with acrylic smooth exterior paint and with cement based water soluble exterior paint i.e snowecem on non -residential building in bsl colony at bbmb sundernagar.
Painting work with acrylic smooth exterior paint and with cement based water soluble exterior paint i.e snowecem on non -residential building in bsl colony at bbmb sundernagar.
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreWbpwd/pw(r)/se/shc/nit no 06 of 2025-2026(2nd-call)
Bridges at 12.20 km and 12.40 km of shikharpur kulti canal road, repair and rehabilitation work under south 24 parganas highway division in the district of south 24 parganas. project-id-pd252632182s000
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreConstruction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park along with fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under barasat highway division no.-i in the district of north
Construction of embankment, dredging of nayanjuli, walking pathway, plantation, bio diversity park fencing work at debi ghat at ch 0.50 of kazi nazrul islam avenue of v.i.p road under bhd no.-i in n 24pgs ei work for compound illu and beau.
Read moreof your Industry type