Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Road From Jagatpurwa Bedani Rcd Road, Primary School Lotwa To Kunduri Kabristan Dlp Road Via Chatakpur (L 2.000 Km.)
|
| Description |
Construction Of Road From Jagatpurwa Bedani Rcd Road, Primary School Lotwa To Kunduri Kabristan Dlp Road Via Chatakpur (L 2.000 Km.)
|
| Organisation | RWD EinC | State Govt. and UT |
| Tender Id | 2024_RWD_92508_1 |
|
Reference Number |
EE/RWD/DALTONGANJ/22/24-25 |
| Tender Fee | 10000 |
| EMD | 3.84 Lakh |
| Tender Value | - |
| Place | Daltonganj |
| Link |
View Original Tender Notice
https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=124687 |
| Start Date | September 09, 2024 14:30 |
| End Date |
Expired
18/09/2024
Expired 756 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening and strengthening/reconstruction work of sardiha to belguma via chamrabahiyar school road (total length-2.816 km) under road division dumka for the year 2026-27
Widening and strengthening/reconstruction work of sardiha to belguma via chamrabahiyar school road (total length-2.816 km) under road division dumka for the year 2026-27
Read moreWidening and strengthening/reconstruction work of barganda chowk to college more via power house road (length - 2.715 km.) for the year 2026-27 under road division, giridih
Widening and strengthening/reconstruction work of barganda chowk to college more via power house road (length - 2.715 km.) for the year 2026-27 under road division, giridih
Read moreConstruction of high level bridge over sidheswari river at ch 18.255 km of gumro to ghasimarni (fatehpur) via garapather road under road division dumka for the year 2026-27.
Construction of high level bridge over sidheswari river at ch 18.255 km of gumro to ghasimarni (fatehpur) via garapather road under road division dumka for the year 2026-27.
Read moreIrqp and strengthening work of asura pwd road to kumardungi via balandia road from km 0.00 to km 38.65 (total length 38.65 km) under road division chaibasa for the year 2026-27
Irqp and strengthening work of asura pwd road to kumardungi via balandia road from km 0.00 to km 38.65 (total length 38.65 km) under road division chaibasa for the year 2026-27
Read moreConstruction of road from sindur baba to panchal pathar via pipartoli harimandir via sahara ground (l-1.900 km.)
Construction of road from sindur baba to panchal pathar via pipartoli harimandir via sahara ground (l-1.900 km.)
Read moreMrl38-kalapathar more to kalapathar uttar via kalapathar primary school under binpur-ii block
Mrl38-kalapathar more to kalapathar uttar via kalapathar primary school under binpur-ii block, pkg wb24138
Read moreL028-khairbari hanuman mandir to panga riverside via tollikura primary school under jalpaiguri-sadar block
L028-khairbari hanuman mandir to panga riverside via tollikura primary school under jalpaiguri-sadar block, pkg wb10277
Read more8.p/l storm pipe line and i/l tile from primary school bhagomajra to jaspal singh house ward no 1 mc kharar.
8.p/l storm pipe line and i/l tile from primary school bhagomajra to jaspal singh house ward no 1 mc kharar.
Read more6.construction of room p/l i/l tiles and other repair works in govt primary school bhagomajra ward no 1 mc kharar.
6.construction of room p/l i/l tiles and other repair works in govt primary school bhagomajra ward no 1 mc kharar.
Read moreof your Industry type