Tender Details

Particulars Details
Title
Earth Work Excavation And Laying Of Retaining Wall,Retainin Wall,Back Filling,Ppc Flooring,Dpc,Maso
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2023/B/3793939
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date August 31, 2023 18:14
End Date
Expired 11/09/2023

Expired 1131 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On EMD Status MSE/MII Status Status
1 GUPTA ARMY GENERAL STORE - 10-09-2023 19:57:39 Offline upload MII Qualified
2 JASBIR ENTERPRISES - 11-09-2023 10:46:12 Vendor Assessed MII MSE Disqualified
3 M/s ESS KAY AGENCIES - 10-09-2023 11:54:57 Offline upload MII Qualified
4 M/s KHANDELWAL MARKETING - 09-09-2023 14:57:37 Offline upload MII Disqualified
5 PANKAJ TRADING COMPANY - 11-09-2023 10:09:59 Offline upload MII Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 PANKAJ TRADING COMPANY(MII) Item Categories : Earth Work Excavation and laying of retaining wall,Retainin wall,Back Filling,PPC Flooring,DPC,Maso 1973140.00 L1
2 GUPTA ARMY GENERAL STORE (MII) Item Categories : Earth Work Excavation and laying of retaining wall,Retainin wall,Back Filling,PPC Flooring,DPC,Maso 2220520.00 L2
3 M/s ESS KAY AGENCIES (MII) Item Categories : Earth Work Excavation and laying of retaining wall,Retainin wall,Back Filling,PPC Flooring,DPC,Maso 2316380.00 L3
Similar Tenders
Provn of retaining wall, earth filling and area development at officers mess at af stn kanheri hills under ge af thane

Provn of retaining wall, earth filling and area development at officers mess at af stn kanheri hills under ge af thane

Read more
Retaining wall earth filling new drain cover and c.c work from meen maurya house to sushila maurya house near mukhuchwan intersection.

Retaining wall earth filling new drain cover and c.c work from meen maurya house to sushila maurya house near mukhuchwan intersection.

Read more
In chandradeepa ward, from sangeeta singh house to golu baba house via munna prajapati house earth filling retaining wall and c.c work.

In chandradeepa ward, from sangeeta singh house to golu baba house via munna prajapati house earth filling retaining wall and c.c work.

Read more
Construction of approach road at bemina chowk connecting with bund road by way of retaining wall, earth filling and other allied items.

Construction of approach road at bemina chowk connecting with bund road by way of retaining wall, earth filling and other allied items.

Read more
In gosail talab ward in mrityunjaypuram colony from maurya ji house to shailendra tiwari house and from shankar ji temple to aditya keshari work of earth filling partial retaining wall and construction of c.c road.

In gosail talab ward in mrityunjaypuram colony from maurya ji house to shailendra tiwari house and from shankar ji temple to aditya keshari work of earth filling partial retaining wall and construction of c.c road.

Read more
In daghar ward in surekhapurma colony from sanjay dubey house via pandey house via amresh add from kunal singh house to shankar ji temple work of earth filling retaining wall new drian cover and c.c

In daghar ward in surekhapurma colony from sanjay dubey house via pandey house via amresh add from kunal singh house to shankar ji temple work of earth filling retaining wall new drian cover and c.c

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Layout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work

Layout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise