Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavation,Retaining Wall,Back Filling,Ppc Flooring,Masonary Work In Super Structure,Internal Plast
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2025/R/513538 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 13, 2025 01:30 |
| End Date |
Expired
14/07/2025
Expired 457 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
ANANTH RESIDENCYANANTH RESIDENCYANANTH RESIDENCYANANTH RESIDENCYANANTH RESIDENCY...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| bncncm | HOLYMEN | vmvmv | 10 | ₹ 288.000 |
| Test item reject | asdf-brand | Test item reject | 1000 | ₹ 49000.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 9.900 |
| bncncm | HOLYMEN | vmvmv | 20 | ₹ 576.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 20 | ₹ 80.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 2 | ₹ 21384.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 11 | ₹ 44.000 |
| BASKETBALL RING | vixen | 460 | 1 | ₹ 999.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 2 | ₹ 990.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 1 | ₹ 10692.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 2 | ₹ 1100.000 |
| BASKETBALL RING | vixen | 460 | 1 | ₹ 999.000 |
| Dell Vostro 3268 SFF - PDC G4560-4GB-1TB-NO DVD-18.5" -Linux - 3Y - WIFI - BT | Dell | Dell Vostro 3268 SFF - PDC G4560-4GB-1TB-NO DVD-18.5"-Linux - 3Y | 1 | ₹ 27040.000 |
| Raisco Basketball Ring (5 Basketball Size With Net) | Unbranded | Raisco Basketball Ring | 11 | ₹ 44.000 |
| bncncm | HOLYMEN | vmvmv | 15 | ₹ 432.000 |
Layout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work
Layout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreExcavation,retaining wall,back filling,ppc flooring,masonary work in super structure,internal plast
Read more
Earth work excavation and laying of retaining wall,retainin wall,back filling,ppc flooring,dpc,maso
Read more
Earth work excavation and laying of retaining wall,retainin wall,back filling,ppc flooring,dpc,maso
Read more
Earthwork excavation,sand filling,back filling,pcc,rcc sub structure,rcc super structure,shuttering
Read more
Back filling work of excavation
Construction of back filling work of excavation gram majhera, block shivpuri distt. shivpuri
Read moreExcavation,boundary wall,back filling,pcc flooring,mesonary work interal and external plastring,put
Read more
Excavation,boundary wall,back filling,pcc flooring,mesonary work interal and external plastring,put
Read more
Construction of cement stone masonary structure retaining wall in burajkotian block panchkula range
Construction of cement stone masonary structure retaining wall in burajkotian block panchkula range
Read moreof your Industry type