Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ward 11 Cc Road Construction Work Dr. Sps Raghuwanshi To Ramesh Rathore
|
| Description |
Ward 11 Cc Road Construction Work Dr. Sps Raghuwanshi To Ramesh Rathore
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_UAD_300352_1 |
|
Reference Number |
SHIVPURI_UAD_2023_001088 |
| Tender Fee | 2000 |
| EMD | 12443 |
| Tender Value | - |
| Place | NAGAR PALIKA PARISHAD SHIVPURI |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | August 21, 2023 15:30 |
| End Date |
Expired
31/08/2023
Expired 1142 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Running , operation and cleaning of chockage material from manual screen at dr. r.p.ghat sps, mansarover ghat sps and trilochan ghat sps., varanasi
Running , operation and cleaning of chockage material from manual screen at dr. r.p.ghat sps, mansarover ghat sps and trilochan ghat sps., varanasi
Read moreCc and bituminous surfacing work from the flour mill of ramesh rathore in village gurau up to thar binai.
Cc and bituminous surfacing work from the flour mill of ramesh rathore in village gurau up to thar binai.
Read more1.16) rf cable assembly- sps-w-2801-4000-sps-w,1.17) rf cable assembly- sps-w-2801-6000-sps-w,1.18) rf cable assembly- sps-w-2801-6000-tps-w,1.19) rf cable assembly- sps-w-2801-9500-tps-w,1.20) rf cable assembly- sps-w-2801-6500-sps-w,1.21) rf cable assembly- sps-w-2801-9500-sps-w,1.22) rf cable assembly-tps-w-2801-1500-sps-w,1.23) rf cable assembly- tps-w-2801-750-tps-w,1.24) rf cable assembly- sps-w2801-8000-sps-w,1.25) rf cable assembly- sps-w-1801-500-sps-w,1.26) rf cable assembly- sps-w-1801-2000-sps-w,1.27) rf cable assembly- tps-w-2801-4000-tps-w
1.16) rf cable assembly- sps-w-2801-4000-sps-w,1.17) rf cable assembly- sps-w-2801-6000-sps-w,1.18) rf cable assembly- sps-w-2801-6000-tps-w,1.19) rf cable assembly- sps-w-2801-9500-tps-w,1.20) rf cable assembly- sps-w-2801-6500-sps-w,1.21) rf cable assembly- sps-w-2801-9500-sps-w,1.22) rf cable assembly-tps-w-2801-1500-sps-w,1.23) rf cable assembly- tps-w-2801-750-tps-w,1.24) rf cable assembly- sps-w2801-8000-sps-w,1.25) rf cable assembly- sps-w-1801-500-sps-w,1.26) rf cable assembly- sps-w-1801-2000-sps-w,1.27) rf cable assembly- tps-w-2801-4000-tps-w
Read moreBreakdown and major repair, replacement work of mansarover ghat sps and trilochan ghat sps at varanasi.
Breakdown and major repair, replacement work of mansarover ghat sps and trilochan ghat sps at varanasi.
Read moreBreakdown and major repair, major replacement work and desilting, cleaning of pump well, sump well and special sump well etc. work at dr. r.p.ghat sps, varanasi.
Breakdown and major repair, major replacement work and desilting, cleaning of pump well, sump well and special sump well etc. work at dr. r.p.ghat sps, varanasi.
Read moreNew dr apic cluster for aci - apic-clusterg5 dr,new dr nexus dashboard cluster for aci - nd-clusterg5s dr,dr spine switches dr,dr border leaf switches - n9k-c93600cd-gx dr,dr fiber leaf switches - n9k-c93180yc-fx3 dr,dr copper leaf switches - n9k-c93108tc-fx3 dc,dr copper leaf switches - n9k-c93108tc-fx3 dr,dr leaf with 50g ports - n9k-c93400ld-h1 dr,wan switches - n9k-c93240yc-fx2 dr,dmz core switch - n9k-c93180yc-fx3 dr,dr partner zone switches - n9k-c93180yc-fx3 dr,dr partner zone routers dr,dr oob management switches - c9200l-48t-4x-e dr,dr oob management switches - c9200l-48t-4x-e dc,dr oob management core switch - c9300x-24y-a dc,dr oob management core switch - c9300x-24y-a dr,dr internet routers- c8550-g2 dr,cost of addon 1g sm fiber optics- glc-lh-smd dr,cost of addon 1g mm optics- glc-sx-mmd dr,cost of addon 1g copper modules- glc-te dc,cost of addon 1g copper modules- glc-te dr,cost of lr 10 g sfp - sfp-10g-lr-s,cost of one time implementation,migration cost,cost of 1st year fa license for firewall
New dr apic cluster for aci - apic-clusterg5 dr,new dr nexus dashboard cluster for aci - nd-clusterg5s dr,dr spine switches dr,dr border leaf switches - n9k-c93600cd-gx dr,dr fiber leaf switches - n9k-c93180yc-fx3 dr,dr copper leaf switches - n9k-c93108tc-fx3 dc,dr copper leaf switches - n9k-c93108tc-fx3 dr,dr leaf with 50g ports - n9k-c93400ld-h1 dr,wan switches - n9k-c93240yc-fx2 dr,dmz core switch - n9k-c93180yc-fx3 dr,dr partner zone switches - n9k-c93180yc-fx3 dr,dr partner zone routers dr,dr oob management switches - c9200l-48t-4x-e dr,dr oob management switches - c9200l-48t-4x-e dc,dr oob management core switch - c9300x-24y-a dc,dr oob management core switch - c9300x-24y-a dr,dr internet routers- c8550-g2 dr,cost of addon 1g sm fiber optics- glc-lh-smd dr,cost of addon 1g mm optics- glc-sx-mmd dr,cost of addon 1g copper modules- glc-te dc,cost of addon 1g copper modules- glc-te dr,cost of lr 10 g sfp - sfp-10g-lr-s,cost of one time implementation,migration cost,cost of 1st year fa license for firewall
Read moreDr jobber 1.00 hss m2 1x12x34,dr jobber 1.50 hss m2 1.50x18x40,dr jobber 2.00 hss m2 2x24x49,dr jobber 2.50 hss m2 2.50x30x57,dr jobber 3.00 hss m2 3x33x61,dr jobber 3.20 hss m2 3.20x36x65,dr jobber 3.50 hss m2 3.50x39x70,dr jobber 4.00 hss m2 4x43x75,dr jobber 4.20 hss m2 4.20x43x75,dr jobber 4.50 hss m2 4.50x47x80,dr jobber 5.00 hss m2 5x52x86,dr jobber 5.50 hss m2 5.50x57x93,dr jobber 6.00 hss m2 6x57x93,dr jobber 6.20 hss m2 6.20x63x101,dr jobber 6.50 hss m2 6.50x63x101,dr jobber 7.00 hss m2 7x69x109,dr jobber 7.50 hss m2 7.50x69x109,dr jobber 8.00 hss m2 8x75x117,dr jobber 8.50 hss m2 8.50x75x117,dr jobber 9.00 hss m2 9x81x125,dr jobber 9.50 hss m2 9.50x81x125,dr jobber 10.00 hss m2 10x87x133,dr jobber 10.50 hss m2 10.50x87x133,dr jobber 11.00 hss m2 11x94x142,dr jobber 11.50 hss m2 11.5x94x142,dr jobber 12.00 hss m2 12x101x151,dr jobber 12.50 hss m2 12.5x101x151,dr jobber 13.00 hss m2 13x101x151,dr jobber 13.50 hss m2 13.5x108x160,dr jobber 14.00 hss m2 14x108x160,dr jobber 14.50 hss m2 14.5x114x169,dr
Dr jobber 1.00 hss m2 1x12x34,dr jobber 1.50 hss m2 1.50x18x40,dr jobber 2.00 hss m2 2x24x49,dr jobber 2.50 hss m2 2.50x30x57,dr jobber 3.00 hss m2 3x33x61,dr jobber 3.20 hss m2 3.20x36x65,dr jobber 3.50 hss m2 3.50x39x70,dr jobber 4.00 hss m2 4x43x75,dr jobber 4.20 hss m2 4.20x43x75,dr jobber 4.50 hss m2 4.50x47x80,dr jobber 5.00 hss m2 5x52x86,dr jobber 5.50 hss m2 5.50x57x93,dr jobber 6.00 hss m2 6x57x93,dr jobber 6.20 hss m2 6.20x63x101,dr jobber 6.50 hss m2 6.50x63x101,dr jobber 7.00 hss m2 7x69x109,dr jobber 7.50 hss m2 7.50x69x109,dr jobber 8.00 hss m2 8x75x117,dr jobber 8.50 hss m2 8.50x75x117,dr jobber 9.00 hss m2 9x81x125,dr jobber 9.50 hss m2 9.50x81x125,dr jobber 10.00 hss m2 10x87x133,dr jobber 10.50 hss m2 10.50x87x133,dr jobber 11.00 hss m2 11x94x142,dr jobber 11.50 hss m2 11.5x94x142,dr jobber 12.00 hss m2 12x101x151,dr jobber 12.50 hss m2 12.5x101x151,dr jobber 13.00 hss m2 13x101x151,dr jobber 13.50 hss m2 13.5x108x160,dr jobber 14.00 hss m2 14x108x160,dr jobber 14.50 hss m2 14.5x114x169,dr
Read moreSps for joint of double stay insulator assembly 35 mm dia
Sps for joint of double stay insulator assembly 35 mm dia
Read moreSps for joint of double stay insulator assembly 35 mm dia
Sps for joint of double stay insulator assembly 35 mm dia
Read moreRepair and renovation work in labs and chambers of dr. manisha malviya, dr. rosy, dr. bikash kumar shaw, dr. bhuvaneshwari b, dr. jyotirmoy ghosh and dr. asha gupta, dr. santosh kisan pagire in the dept. of chemistry, iit(bhu), varanasi.
Repair and renovation work in labs and chambers of dr. manisha malviya, dr. rosy, dr. bikash kumar shaw, dr. bhuvaneshwari b, dr. jyotirmoy ghosh and dr. asha gupta, dr. santosh kisan pagire in the dept. of chemistry, iit(bhu), varanasi.
Read moreof your Industry type