Tender Details
Particulars | Details |
---|---|
Title |
Widening Strengthening Of Existing Damaged Cc Road Of Mr 1 (From Lic Office To Adarsha Motors) With Cc Pavement With Vdf Flooring At Industrial Park, Warangal, Warangal Dist. (With Iala Funds)(2nd Call)
|
Description |
Widening Strengthening Of Existing Damaged Cc Road Of Mr 1 (From Lic Office To Adarsha Motors) With Cc Pavement With Vdf Flooring At Industrial Park Warangal, Warangal Dist. (With Iala Funds) (2nd Call)
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 551742 |
Reference Number |
01/ZM/DB/WGL/TGIIC/2024-25, Dated:- 16-10-2024 |
Tender Fee | 650 |
EMD | 19000 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | October 18, 2024 20:30 |
End Date |
24/10/2024 ( Expired 223 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Relaying of damaged road with cc pavement and repairs to damaged car shed in gm office premises, mandamarri area, mancherial dist, t g.
Relaying of damaged road with cc pavement and repairs to damaged car shed in gm office premises, mandamarri area, mancherial dist, t g.
Read moreZone-03, ward-12, tender for construction of bituminous road over old existing cc road from nh-7 beside of post office to behind of anguri building, and from rit colony via behind of lic building to main road near shri dilip saxena house. (2nd call)
Zone-03, ward-12, tender for construction of bituminous road over old existing cc road from nh-7 beside of post office to behind of anguri building, and from rit colony via behind of lic building to main road near shri dilip saxena house. (2nd call)
Read moreConstruction of rcc drain for existing nala from plot no. 20/a to 15 at industrial park warangal, warangal dist.
Construction of rcc drain for existing nala from plot no. 20/a to 15 at industrial park warangal, warangal dist.
Read moreStrengthening of existing wbm road with cc pavement including pipe culvert at main entrance of the industrial park jangaon (old), jangaon dist.
Strengthening of existing wbm road with cc pavement including pipe culvert at main entrance of the industrial park jangaon (old), jangaon dist.
Read moreRoad work
Strengthening of existing damaged balance bt roads with cc pavement including storm water drains at textile park madikonda, warangal dist.
Read moreStrengthening of existing damaged gravel road in front of plot nos. 177 to 180 with cc pavement with vdf flooring at industrial park rampur, hanamkonda dist. (with iala funds)
Strengthening of existing damaged gravel road in front of plot nos. 177 to 180 with cc pavement with vdf flooring at industrial park rampur, hanamkonda dist. (with iala funds)
Read moreSweeping of all the roads, cleaning of storm water drains, lifting and transportation of garbage (to the recognized dumping yard near textile park madikonda) of industrial park warangal and kakatiya autonagar warangal for a period of twelve months i.e., from 01-04-2025 to 31-03-2026. (with iala funds)
Sweeping of all the roads, cleaning of storm water drains, lifting and transportation of garbage (to the recognized dumping yard near textile park madikonda) of industrial park warangal and kakatiya autonagar warangal for a period of twelve months i.e. from 01-04-2025 to 31-03-2026. (with iala funds)
Read moreWbpwd/pw(r)/se/shc/nit no 16 of 2024-2025 (2nd-call)
Kakdwip - steamerghat road from 0.953 kmp to 1.563 kmp widening and strengthening work by interlocking concrete block pavement under diamond harbour highway division in the district of south 24 parganas in the financial year 2024-25.&#x0d
Read moreWidening and strengthening of growth center jainpur road (navipur gajner road) with 4 lane from km. 1 to 4(600) in district kanpur dehat under the industrial / logistics scheme in financial year 2024-25 (including 05 years maintenance cost.) (total
Widening and strengthening of growth center jainpur road (navipur gajner road) with 4 lane from km. 1 to 4(600) in district kanpur dehat under the industrial / logistics scheme in financial year 2024-25 (including 05 years maintenance cost.) (total
Read moreSweeping of all the roads, cleaning of storm water drains, lifting and transportation of garbage (to the recognized dumping yard near textile park madikonda) of industrial park warangal and kakatiya autonagar warangal for a period of six months i.e. from 01-10-2024 to 31-03-2025. (with iala funds)
Sweeping of all the roads, cleaning of storm water drains, lifting and transportation of garbage (to the recognized dumping yard near textile park madikonda) of industrial park warangal and kakatiya autonagar warangal for a period of six months i.e. from 01-10-2024 to 31-03-2025 (with iala funds)
Read moreof your Industry type