Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Drainage Syphon On Disty. No 5 Of P.Canal At Rd 4144 M Near Village Mantiri With Renovation Of Cd Near Jerkand And Gangadhar For The Year 2025 26
|
Description |
Construction Of Drainage Syphon On Disty. No 5 Of P.Canal At Rd 4144 M Near Village Mantiri With Renovation Of Cd Near Jerkand And Gangadhar For The Year 2025 26
|
Organisation | CE-BM,LMB Basin,BBSR | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 84100 |
Tender Value | |
Place | BALICHANDRAPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | April 05, 2025 15:30 |
End Date |
21/04/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.
Read moreAAAAAAAAAA
Login to viewSoil investigation site, construction of 100 cum ohr at hw construction of p/h 2nd and 3rd site, laying of rising main distribution line and providing fhtc as per departmentaldesigndrawing for dalmoni tg zi zi zii underbirpara s-d alipurduar division
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreInviting rates of moorum and stone dust (5-6 mm th bt metel) with spreading complete work for the yearly. (retes including royalty and spreading complete) (2025-26)
Inviting rates of moorum and stone dust (5-6 mm th bt metel) with spreading complete work for the yearly. (retes including royalty and spreading complete) (2025-26)
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and applying all types of painting as mentioned paint.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and applying all types of painting as mentioned paint.
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreSupply of man power 25 no. skilled and unskilled (contract basis) for water supply scheme.session 2025-26
Supply of man power 25 no. skilled and unskilled (contract basis) for water supply scheme at nagar palika parishad dhanpuri distt-shahdol (m.p.) session 2025-26
Read moreof your Industry type