Tender Details

Particulars Details
Title
Construction Of Drainage Syphon On Disty. No 5 Of P.Canal At Rd 4144 M Near Village Mantiri With Renovation Of Cd Near Jerkand And Gangadhar For The Year 2025 26
Description
Construction Of Drainage Syphon On Disty. No 5 Of P.Canal At Rd 4144 M Near Village Mantiri With Renovation Of Cd Near Jerkand And Gangadhar For The Year 2025 26
Organisation CE-BM,LMB Basin,BBSR | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 10000
EMD 84100
Tender Value
Place BALICHANDRAPUR
Link

AAAAAAAAAA

Login to view
Start Date April 05, 2025 15:30
End Date

21/04/2025 ( 0 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Consultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.

Consultancy services for ae for supervision of construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24-913 (near nandura) in the state of maharashtra on epc mode.

Read more

Soil investigation site, construction of 100 cum ohr at hw construction of p/h 2nd and 3rd site, laying of rising main distribution line and providing fhtc as per departmentaldesigndrawing for dalmoni tg zi zi zii underbirpara s-d alipurduar division

Read more
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state

Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state

Read more
Inviting rates of moorum and stone dust (5-6 mm th bt metel) with spreading complete work for the yearly. (retes including royalty and spreading complete) (2025-26)

Inviting rates of moorum and stone dust (5-6 mm th bt metel) with spreading complete work for the yearly. (retes including royalty and spreading complete) (2025-26)

Read more
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.

Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.

Read more
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe

Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe

Read more
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and applying all types of painting as mentioned paint.

Inviting rates of construction material with complete work given below for yearly (2025-26) providing and applying all types of painting as mentioned paint.

Read more
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl

Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl

Read more
Supply of man power 25 no. skilled and unskilled (contract basis) for water supply scheme.session 2025-26

Supply of man power 25 no. skilled and unskilled (contract basis) for water supply scheme at nagar palika parishad dhanpuri distt-shahdol (m.p.) session 2025-26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise