About Tender
🚂 Invitation For Bids: Final Location Survey For Bilaspur Shahdol Katni 4th Line 📏🌱 The Ministry Of Railways, Central Government, Invites Bids From Experienced Firms For Conducting A Comprehensive Final Location Survey For The Bilaspur Shahdol Katni 4th Line (321 Km) Under S.E.C. Railway. 📅 Bid Submission Deadline: July 12, 2024, 3:00 Pm The Scope Of Work Includes Collection Of Field Details For Geotechnical Investigation, Preparation Of Geotechnical Advisory Documents (Ga Ds), Other Drawings, And A Detailed Survey Report And Estimate. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 3,88,900. No Tender Fee Is Applicable. Detailed Tender Documents Are Available For Review To Gain Complete Insights Into The Project Requirements. Keywords: Final Location Survey, Geotechnical Investigation, Ga Ds, Survey Report, Estimate, S.E.C. Railway, Ministry Of Railways, Government Tender, Infrastructure Project, Railway Line Construction| Particulars | Details |
|---|---|
| Title |
Conducting Final Location Survey, Including Collection Of Field Details For Geotechnical Investigation, Preparation Of Ga Ds &Amp Other Drawings And Preparation Of Survey Report &Amp Estimate Etc For The Work Of Bilaspur Shahdol Katni 4th Line (321 Km) In S.E.C. Railway.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75664975 |
|
Reference Number |
CEC-BSP-24-25-05 |
| Tender Fee | 0 |
| EMD | 3.89 Lakh |
| Tender Value | - |
| Place | Bilaspur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75664975/viewNitPdf_4604891.pdf |
| Start Date | June 20, 2024 22:50 |
| End Date |
Expired
12/07/2024
Expired 826 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).
Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).
Read moreRate contract for carrying out final location survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of dpr (including electrical, signal, operating/ traffic works and preparation of epc bid package) in connection with survey for new line, bye-pass line, doubling/multitracking, flyover etc. in e.c.railway including providing facilitation to competent authority for land acquisition (cala) for land acquisition work to the railway proje
Rate contract for carrying out final location survey (geotechnical studies, design & preparation of drawing) and other preliminary activities for preparation of dpr (including electrical, signal, operating/ traffic works and preparation of epc bid package) in connection with survey for new line, bye-pass line, doubling/multitracking, flyover etc. in e.c.railway including providing facilitation to competent authority for land acquisition (cala) for land acquisition work to the railway proje
Read moreCarrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Read moreConducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)
Read moreConducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro
Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro
Read moreConducting final location survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bilaspur shahdol- katni 4th line (321 km) in s.e.c. railway.
For complete deion and other details, please refer to tender
Read moreConducting final location survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bilaspur shahdol- katni 4th line (321 km) in s.e.c. railway.
For complete deion and other details, please refer to tender
Read moreConducting final location survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of new line between korba-ambikapur (180 km) in s.e.c. railway.
For complete deion and other details, please refer to tender
Read moreConducting final location survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bilaspur - pendra road 3rd line (103 km) in s.e.c. railway
For complete deion and other details, please refer to tender
Read moreConducting final location survey, including collection of field details for geotechnical investigation, preparation of gads & other relevant drawings and preparation of survey report & estimate etc for the work of new 3rd & 4th line between champa-gevra road (92 km) in s.e.c. railway