Tender Details

Particulars Details
Title
Construction Of Gate At Interstate Connectivity Road ( For Two Lane) On Shoharatgarh Nepal Seema Road
Description
Construction Of Gate At Interstate Connectivity Road ( For Two Lane) On Shoharatgarh Nepal Seema Road
Organisation Government of Uttar Pradesh
Tender Id 2023_CEGKP_836343_2
Reference
Number
5384/4E-NIVIDA-BASTI CIRCLE/23-24 DATED-26-08-2023
Tender Fee 2714
EMD 4.65 Lakh
Tender Value -
Place O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date September 08, 2023 22:00
End Date
Expired 16/09/2023

Expired 1127 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Modular br (grse) 140, cl-70 two lane

Modular br (grse) 140, cl-70 two lane

Read more
Construction of simra pritvipur road two lane length 8.40 k.m with electirification work

Construction of simra pritvipur road two lane length 8.40 k.m with electirification work

Read more
Work of drain and interlocking tiles from the main gate of the water tank to seema house in ward 46, village mainapur mandir marg.

Work of drain and interlocking tiles from the main gate of the water tank to seema house in ward 46, village mainapur mandir marg.

Read more
Widening from two lane to four lane and strengthening at km 0/0 - 4/0 of malur - hosur - adhiyamankottai road including cd works (sh-17)

Widening from two lane to four lane and strengthening at km 0/0 - 4/0 of malur - hosur - adhiyamankottai road including cd works (sh-17)

Read more
Preparation of detailed project report at sub division ujjain (singal and two lane road) dn. ujjain

Preparation of detailed project report at sub division ujjain (singal and two lane road) dn. ujjain

Read more
Pepration of detailed project report at sub dn. ujjain for main budget 2026 (two lane road)

Pepration of detailed project report at sub dn. ujjain for main budget 2026 (two lane road)

Read more
Construction work of badagaon to sihoniya road two lane road length-15.50 km. (including pole shifting)

Construction work of badagaon to sihoniya road two lane road length-15.50 km. (including pole shifting)

Read more
Cement concrete work from parul verma to makhan paan shop, seema rai lane and nearby lanes at mahesh bagh colony in ward no. 30 under zone no. 08 (parshad nidhi)

Cement concrete work from parul verma to makhan paan shop, seema rai lane and nearby lanes at mahesh bagh colony in ward no. 30 under zone no. 08 (parshad nidhi)

Read more
Design and cost estimation for construction of single span 400 meter two lane class a loading motor bridge

Design and cost estimation for construction of single span 400 meter two lane class a loading motor bridge (design and drawing of bridge, vetting of design and drawing, preparation of dpr and forest proposal in distt. champawat uttarakhand india

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise