Tender Details
Particulars | Details |
---|---|
Title |
E 205/Mmgpa/Injectable Phase Iii (Dhs)
|
Description |
E 205/Mmgpa/Injectable Phase Iii (Dhs)
|
Organisation | Maharashtra Medical Goods Procurement Authority Mumbai | State Govt. and UT |
Tender Id | 2025_MMGPA_1148878_1 |
Reference Number |
E-205/MMGPA/Injectable Phase III (DHS) |
Tender Fee | 7226 |
EMD | 95000 |
Tender Value | |
Place | 1st Floor, Aarogya Bhawan |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1999601 |
Start Date | February 11, 2025 22:00 |
End Date |
21/03/2025 ( Expired 84 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu package 9
Consultancy services for preparation of gis based master plans for phase ii, phase iii and announcement towns in tamil nadu- package 1 punjai puliyampatti, bhavanisagar, sathyamangalam, bhavani
Read moreCa no.cwe bly/ge (e)/23 of 2025- 2026special repair to otm bldg no t-138 (or living) of inf bn-iii and storage bldg of stn hq shahjahanpur cantt under ge (east) bareilly
Ca no.cwe bly/ge (e)/23 of 2025- 2026special repair to otm bldg no t-138 (or living) of inf bn-iii and storage bldg of stn hq shahjahanpur cantt under ge (east) bareilly
Read moreUnder iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme.
Under iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme. &#x0d &#x0d
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreSpecial repair/replacement of hpsv lights with led lights and its associates (phase-iii) at af stn awantipur
Special repair/replacement of hpsv lights with led lights and its associates (phase-iii) at af stn awantipur
Read moreGe/chm-52/2025-2026 repair to joinery, plumbing and other misc work at or block sector e under age b/r iii at chandimandir
Ge/chm-52/2025-2026 repair to joinery, plumbing and other misc work at or block sector e under age b/r iii at chandimandir
Read moreI) boring of 02 nos deep tube well with submerible pump (ii) c/o 02 nos water harvesting ground water recharge (iii) c/o rcc drain covers (length 500 mtr) for open storm water drain at 205 cobra bn, crpf, bihar
I) boring of 02 nos deep tube well with submerible pump (ii) c/o 02 nos water harvesting ground water recharge (iii) c/o rcc drain covers (length 500 mtr) for open storm water drain
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreAAAAAAAAAA
Login to viewConstruction of cc road block sandeshkhali ii ced-iii sdb 3190m core plan
Read moreof your Industry type