Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
New Construction Of Sub Center Building At Kurund Tal Bhiwandi Dist Thane
|
Description |
New Construction Of Sub Center Building At Kurund Tal Bhiwandi Dist Thane
|
Organisation | SE National Health Mission State Health Society Mumbai | State Govt. and UT |
Tender Id | 2024_NHM_1005508_1 |
Reference Number |
IDW/NHM/THANE/2023-24/08-06 |
Tender Fee | 590 |
EMD | 42637 |
Tender Value | |
Place | Sub Center Building at Kurund Tal Bhiwandi Dist Th |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1760868 |
Start Date | February 15, 2024 22:30 |
End Date |
23/02/2024 ( Expired 488 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreRsrtc invite tender for leasing of commercial space and maintenance of entire new building at central bus stand, jodhpur
Rsrtc invite tender for leasing of commercial space and maintenance of entire new building at central bus stand, jodhpur
Read moreConstruction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Construction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Read moreModification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Modification / shifting of 220 kv bamnauli-dial overhead, double circuit transmission line infringing to new proposed track at bijwasan railway station on turnkey basis.
Read moreRequest for proposal for (rfp) selection of transaction advisor for development of new outer harbour at chennai port on design, build, finance, operate and transfer (dbfot) basis
Request for proposal for (rfp) selection of transaction advisor for development of new outer harbour at chennai port on design, build, finance, operate and transfer (dbfot) basis
Read moreProcurement of 07 number 500mva power transformers on turnkey basis.
Design supply erection testing commissioning of 07 no of 400 220 33kv 500 mva power transformer at 400 kv sub stations of dtl on turnkey basis
Read moreConstruction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.
Read moreDesign and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Design and construction of rehab buildings along with architectural specifications and finishes landscaping mep and allied infrastructural work at ramabai ambedkar nagar and kamraj nagar ghatkopar e mumbai phase i package a
Read moreof your Industry type