Tender Details
Particulars | Details |
---|---|
Title |
Srtc Of 6 Nos 4 Nos At Ps I And 2 Nos At Ps Ii Of Wet Well Vertical Turbine Pump In Place Of Already Installed Wet Well Vertical Pump And Supply, Fixing Of Shutters 1 No. Ps I And 1 No. Ps Ii At Veer Tejaji Bangarsar Lift Scheme During Year 2023 24
|
Description |
Srtc Of 6 Nos 4 Nos At Ps I And 2 Nos At Ps Ii Of Wet Well Vertical Turbine Pump In Place Of Already Installed Wet Well Vertical Pump And Supply, Fixing Of Shutters 1 No. Ps I And 1 No. Ps Ii At Veer Tejaji Bangarsar Lift Scheme During Year 2023 24
|
Organisation | Government of Rajasthan |
Tender Id | 2023_IGNP_366048_2 |
Reference Number |
EE/02/ 2023-24 |
Tender Fee | 5000 |
EMD | 2.66 Lakh |
Tender Value | |
Place | Executive Engineer Field Mech Dn II IGNP Bikaner |
Link | https://eproc.rajasthan.gov.in |
Start Date | September 13, 2023 23:30 |
End Date |
23/09/2023 ( Expired 595 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of paver block road from debabrata debnath house to sajal saha house at chandipara( ward no-06) road l-100.00 mtr and at pwd type-iii and type-ii quarter complex under pwd(randb) amarpur sub-division -i during the year 2025-26/sh- gsb, s
Construction of paver block road from debabrata debnath house to sajal saha house at chandipara( ward no-06) road l-100.00 mtr and at pwd type-iii and type-ii quarter complex under pwd(randb) amarpur sub-division -i during the year 2025-26/sh- gsb, s
Read moreNiq no.08/wbtdcl of 2025-26(technical)
Supply, fitting and fixing of sofa cum bed with two nos. pillows and other allied works at different&#x0d tourism property of south bengal under wbtdcl during the financial&#x0d year 2025-26.
Read moreDrilling of 150 mm and 150m. deep tube well and installation of india mark hand pump including construction of plate farm complete at ward 63 file no. 157/25x9/1
Drilling of 150 mm and 150m. deep tube well and installation of india mark hand pump including construction of plate farm complete at ward 63 file no. 157/25x9/1
Read moreDrilling of 150 mm dia tube well and installation of indioa mark hand pump including construction of plate farm complete at different location ward 66 file no. 156/25x9/1
Drilling of 150 mm dia tube well and installation of indioa mark hand pump including construction of plate farm complete at different location ward 66 file no. 156/25x9/1
Read moreProviding, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation tube well in connection to accommodate fhtc at pump house no.-i and ii under kishorepur ground water based water
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augmentation tube well in connection to accommodate fhtc at pump house no.-i and ii under kishorepur ground water based water
Read moreMaking 02 nos pump switch shed near sump no.1 and face sump at amgaon ocp of bishrampur amgaon sub-area .(for monsoon preparation)
Making 02 nos pump switch shed near sump no.1 and face sump at amgaon ocp of bishrampur amgaon sub-area .(for monsoon preparation)
Read moreConstruction of 04(four) nos. toilet including installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity at upgraded middle school tham under csr, dvc, tilaiya dam, t.k.division konar
Construction of 04(four) nos. toilet including installation of 01(one) no. deep tube well with solar based pump and overhead water tank of 2000 ltr. capacity at upgraded middle school tham under csr, dvc, tilaiya dam, t.k.division konar
Read moreProcurement of vertical turbine pump complete with installation, testing and commissioning at ph ii srhp sikidiri
Procurement of vertical turbine pump complete with installation, testing and commissioning at ph ii srhp sikidiri
Read moreConstruction work of 2 nos -132kv feeder bay work at 400 kv s/s chhegaon (torni) substation for pump house - 01 and 02 and 1 no 33kv bay at 132kv chhegaon substation for pump house 03 and 1 nos 33kv bay at 132kv zhirniya substation for pump house - 4
Construction work of 2 nos -132kv feeder bay work at 400 kv s/s chhegaon (torni) substation for pump house - 01 and 02 and 1 no 33kv bay at 132kv chhegaon substation for pump house 03 and 1 nos 33kv bay at 132kv zhirniya substation for pump house - 4
Read moreAnnual maintenance of 1 no. schindler make lift installed at high court extension block a, sector 17, chandigarh (during the period of 2025 2026).
&#x0d annual maintenance of 1 no. schindler make lift installed at high court extension block a, sector 17, chandigarh (during the period of 2025 2026).
Read moreof your Industry type