Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Unforeseen Urgent Work As And When Required At Ps I And Ii Of Veer Tejaji (Bangarsar) Lift Scheme During Year 2025 26
|
| Description |
Unforeseen Urgent Work As And When Required At Ps I And Ii Of Veer Tejaji (Bangarsar) Lift Scheme During Year 2025 26
|
| Organisation | IGNP | State Govt. and UT |
| Tender Id | 2026_IGNP_548211_1 |
|
Reference Number |
EE/06/2025-26 Iten 02 |
| Tender Fee | 700 |
| EMD | 9952 |
| Tender Value | - |
| Place | vtlc |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=977439 |
| Start Date | March 24, 2026 23:30 |
| End Date |
Expired
06/04/2026
Expired 195 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair of internal mines road with wbm materials as and when required during monsoon year 2027 at hingula ocp under hingula area
Repair of internal mines road with wbm materials as and when required during monsoon year 2027 at hingula ocp under hingula area
Read moreTggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Read moreKtps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Ktps vii stage-adm-ss-gs-rewiring of various type departmental quaters and offices etc in colony distribution i ii sections as and when required during the fy 2026-27
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreEm-divn:preventive annual maintenance and servicing of ms chhabi electrical pvt ltd make 220v 850a 220v 570a 220v 40a 220v25 220v 100a and 48v 25a dc chargers located at main plant silo raw water pump house and switchyard as and when required during the year 2026 27
Em-divn:preventive annual maintenance and servicing of ms chhabi electrical pvt ltd make 220v 850a 220v 570a 220v 40a 220v25 220v 100a and 48v 25a dc chargers located at main plant silo raw water pump house and switchyard as and when required during the year 2026 27
Read moreHq_med_gte_advanced apheresis system (technical specifications as per attached document to this tender). [the quoted rate for plateletpheresis kit (contents of kit as perdocument attached to the tender) for one unit of sdp, mentioned under items, vide sr.no.3, will remain valid for a period of five (5) years. plateletpheresis kit will be procured on an as and when required by consignee within during this five (5) years period.]
Hq_med_gte_advanced apheresis system (technical specifications as per attached document to this tender). [the quoted rate for plateletpheresis kit (contents of kit as perdocument attached to the tender) for one unit of sdp, mentioned under items, vide sr.no.3, will remain valid for a period of five (5) years. plateletpheresis kit will be procured on an as and when required by consignee within during this five (5) years period.]
Read moreUnforeseen urgent work as and when required at dr. karni singh lift scheme during year 2025-26
Unforeseen urgent work as and when required at dr. karni singh lift scheme during year 2025-26
Read moreUnforeseen urgent work as and when required at dr. karni singh lift scheme during year 2024-25.
Unforeseen urgent work as and when required at dr. karni singh lift scheme during year 2024-25.
Read moreOperation and maintenance repairing work at veer tejaji (bangarsar) lift scheme ps i to ps ii on contract basis for 2 years.
Operation and maintenance repairing work at veer tejaji (bangarsar) lift scheme ps i to ps ii on contract basis for 2 years.
Read moreOperation and maintenance of ps i to ps ii for two years of veer tejaji (bangarsar) lift scheme for the year 2025-26
Operation and maintenance of ps i to ps ii for two years of veer tejaji (bangarsar) lift scheme for the year 2025-26
Read moreof your Industry type