Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Addition / Alteration To Shed No. 53 At 28 Ed Afs, Amla Building Works 🛠️ The E In C Branch Of The Military Engineer Services, Under The Central Government, Invites Bids For The Addition And Alteration Of Shed No. 53 Located At 28 Ed Afs, Amla Building Works. 📅 Bid Submission Deadline: May 15, 2024, 6:00 Pm Tender Fee: Inr 1000 Emd: Inr 141160 Interested Contractors Must Submit Detailed Bids, Including Technical Specifications, Cost Estimates, And A Timeline For Project Completion, Adhering To The Prescribed Tender Documentation Format. Keywords: Military Engineer Services, Central Government, Construction, Addition And Alteration, Shed No. 53, Amla Building Works, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Providing And Laying Of 30 Mm Thick (Consolidated) Bituminous Concrete Layer On Road Sector Between Km 15.00 To Km 42.00 At Different Stretches On Road Pithoragarh Tawaghat And Tack Coat With Bitumen Emulsion Over Existing Surface, Correction Work W
|
| Description |
Providing And Laying Of 30 Mm Thick (Consolidated) Bituminous Concrete Layer On Road Sector Between Km 15.00 To Km 42.00 At Different Stretches On Road Pithoragarh Tawaghat And Tack Coat With Bitumen Emulsion Over Existing Surface, Correction Work W
|
| Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
| Tender Id | 2024_MES_649867_1 |
|
Reference Number |
80635 |
| Tender Fee | 0 |
| EMD | 7.3 Lakh |
| Tender Value | - |
| Place | Pithoragarh-Tawaghat Road uttarakhand state |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=790362 |
| Start Date | May 19, 2025 15:30 |
| End Date |
Expired
24/05/2025
Expired 507 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing, laying, spreading and compaction of bc 30mm thick (consolidated) including cleaning, applying tack coat using bitumen emulsion between km 6pt00 to km 15pt328 on pithoragarh tawaghat road (part i), km 6pt00 to km 44pt00 on
Baijnath munsiyari road (part ii) for resurfacing including correction work for road pithoragarh tawaghat only in aor of 47 brtf and km 62pt00 to km 67pt68 on pithoragarh tawaghat road (partiii) for resurfacing incl correction work in aor of 765 brtf
Read moreProviding, laying, spreading and compaction of 40 mm thick consolidated bituminous concrete (hmp readymix laying with paver finisher) including tack coat and correction work with 50 mm thick consolidated dense bituminous mecadam including tack coat a
Providing, laying, spreading and compaction of 40 mm thick consolidated bituminous concrete (hmp readymix laying with paver finisher) including tack coat and correction work with 50 mm thick consolidated dense bituminous mecadam including tack coat a
Read moreProviding and applying tack coat using hot straight run bitumen emulsion as per scope of work,bit m
Read more
Providing, laying, spreading and compaction of 40 mm thick consolidated bc incl tack coat and correction work with bc including tack coat along with road marking for resurfacing works on rd dikchu-sanklang and mangan-chungthang under 107 rcc in 758
Providing, laying, spreading and compaction of 40 mm thick consolidated bc incl tack coat and correction work with bc including tack coat along with road marking for resurfacing works on rd dikchu-sanklang and mangan-chungthang under 107 rcc in 758
Read moreProviding hmp ready mix, laying by paver and compaction bc of 30 mm thick including correction works with bm 50 mm thick cleaning of road surface and applying tack coat with bitumen emulsion before laying bc for resurfacing on existing surface, berm
Providing hmp ready mix, laying by paver and compaction bc of 30 mm thick including correction works with bm 50 mm thick cleaning of road surface and applying tack coat with bitumen emulsion before laying bc for resurfacing on existing surface, berm
Read moreProviding, laying, spreading and comp of 40 mm consolidated bc incl tack coat and correction work with bc including tack coat along with road marking resurfacing works between 0.00 to km 4.800 on road gangtok chungthang under 129 rcc in 758 brtf are
Providing, laying, spreading and comp of 40 mm consolidated bc incl tack coat and correction work with bc including tack coat along with road marking resurfacing works between 0.00 to km 4.800 on road gangtok chungthang under 129 rcc in 758 brtf are
Read moreP/l of bc of 30 mm thick including correction works with bc 50 mm thick and applying tack coat with bitumen emulsion before laying bc for resurf on existing surface and edge marking bet km 12.235 to km 19.985 on road diyalkhai-sinzwal
P/l of bc of 30 mm thick including correction works with bc 50 mm thick and applying tack coat with bitumen emulsion before laying bc for resurf on existing surface and edge marking bet km 12.235 to km 19.985 on road diyalkhai-sinzwal
Read moreP/l of bc of 30 mm thick including correction works with bc 50 mm thick and applying tack coat with bitumen emulsion before laying bc for resurf on existing surface and edge marking bet km 12.235 to km 19.985 on road diyalkhai-sinzwal
P/l of bc of 30 mm thick including correction works with bc 50 mm thick and applying tack coat with bitumen emulsion before laying bc for resurf on existing surface and edge marking bet km 12.235 to km 19.985 on road diyalkhai-sinzwal
Read moreProviding, laying, spreading and comp of 30 mm thick bc consolidated incl tack coat and correction work with 30 mm thick consolidated bc along with road marking and road studs for resurf works between km 0.90 to km 24.36 on road old jnm and between k
Providing, laying, spreading and comp of 30 mm thick bc consolidated incl tack coat and correction work with 30 mm thick consolidated bc along with road marking and road studs for resurf works between km 0.90 to km 24.36 on road old jnm and between k
Read moreBituminous concrete including tack coat and correction work with 30 and 40 mm thick consolidated bituminous concrete along with road marking for resurfacing works on various roads under 107 rcc/758 brtf under project
Bituminous concrete including tack coat and correction work with 30 and 40 mm thick consolidated bituminous concrete along with road marking for resurfacing works on various roads under 107 rcc/758 brtf under project
Read moreof your Industry type