Tender Details

About Tender

🏗️ Invitation For Bids: Addition / Alteration To Shed No. 53 At 28 Ed Afs, Amla Building Works 🛠️ The E In C Branch Of The Military Engineer Services, Under The Central Government, Invites Bids For The Addition And Alteration Of Shed No. 53 Located At 28 Ed Afs, Amla Building Works. 📅 Bid Submission Deadline: May 15, 2024, 6:00 Pm Tender Fee: Inr 1000 Emd: Inr 141160 Interested Contractors Must Submit Detailed Bids, Including Technical Specifications, Cost Estimates, And A Timeline For Project Completion, Adhering To The Prescribed Tender Documentation Format. Keywords: Military Engineer Services, Central Government, Construction, Addition And Alteration, Shed No. 53, Amla Building Works, Tender, Bid Submission
Particulars Details
Title
Providing And Laying Of 30 Mm Thick (Consolidated) Bituminous Concrete Layer On Road Sector Between Km 15.00 To Km 42.00 At Different Stretches On Road Pithoragarh Tawaghat And Tack Coat With Bitumen Emulsion Over Existing Surface, Correction Work W
Description
Providing And Laying Of 30 Mm Thick (Consolidated) Bituminous Concrete Layer On Road Sector Between Km 15.00 To Km 42.00 At Different Stretches On Road Pithoragarh Tawaghat And Tack Coat With Bitumen Emulsion Over Existing Surface, Correction Work W
Organisation Dte General Border Roads Organisation | Central Govt. Ministry/Department
Tender Id 2024_MES_649867_1
Reference
Number
80635
Tender Fee 0
EMD 7.3 Lakh
Tender Value -
Place Pithoragarh-Tawaghat Road uttarakhand state
Link
View Original Tender Notice

https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=790362

Start Date May 19, 2025 15:30
End Date
Expired 24/05/2025

Expired 507 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing, laying, spreading and compaction of bc 30mm thick (consolidated) including cleaning, applying tack coat using bitumen emulsion between km 6pt00 to km 15pt328 on pithoragarh tawaghat road (part i), km 6pt00 to km 44pt00 on

Baijnath munsiyari road (part ii) for resurfacing including correction work for road pithoragarh tawaghat only in aor of 47 brtf and km 62pt00 to km 67pt68 on pithoragarh tawaghat road (partiii) for resurfacing incl correction work in aor of 765 brtf

Read more
Providing, laying, spreading and compaction of 40 mm thick consolidated bituminous concrete (hmp readymix laying with paver finisher) including tack coat and correction work with 50 mm thick consolidated dense bituminous mecadam including tack coat a

Providing, laying, spreading and compaction of 40 mm thick consolidated bituminous concrete (hmp readymix laying with paver finisher) including tack coat and correction work with 50 mm thick consolidated dense bituminous mecadam including tack coat a

Read more
Providing, laying, spreading and compaction of 40 mm thick consolidated bc incl tack coat and correction work with bc including tack coat along with road marking for resurfacing works on rd dikchu-sanklang and mangan-chungthang under 107 rcc in 758

Providing, laying, spreading and compaction of 40 mm thick consolidated bc incl tack coat and correction work with bc including tack coat along with road marking for resurfacing works on rd dikchu-sanklang and mangan-chungthang under 107 rcc in 758

Read more
Providing hmp ready mix, laying by paver and compaction bc of 30 mm thick including correction works with bm 50 mm thick cleaning of road surface and applying tack coat with bitumen emulsion before laying bc for resurfacing on existing surface, berm

Providing hmp ready mix, laying by paver and compaction bc of 30 mm thick including correction works with bm 50 mm thick cleaning of road surface and applying tack coat with bitumen emulsion before laying bc for resurfacing on existing surface, berm

Read more
Providing, laying, spreading and comp of 40 mm consolidated bc incl tack coat and correction work with bc including tack coat along with road marking resurfacing works between 0.00 to km 4.800 on road gangtok chungthang under 129 rcc in 758 brtf are

Providing, laying, spreading and comp of 40 mm consolidated bc incl tack coat and correction work with bc including tack coat along with road marking resurfacing works between 0.00 to km 4.800 on road gangtok chungthang under 129 rcc in 758 brtf are

Read more
P/l of bc of 30 mm thick including correction works with bc 50 mm thick and applying tack coat with bitumen emulsion before laying bc for resurf on existing surface and edge marking bet km 12.235 to km 19.985 on road diyalkhai-sinzwal

P/l of bc of 30 mm thick including correction works with bc 50 mm thick and applying tack coat with bitumen emulsion before laying bc for resurf on existing surface and edge marking bet km 12.235 to km 19.985 on road diyalkhai-sinzwal

Read more
P/l of bc of 30 mm thick including correction works with bc 50 mm thick and applying tack coat with bitumen emulsion before laying bc for resurf on existing surface and edge marking bet km 12.235 to km 19.985 on road diyalkhai-sinzwal

P/l of bc of 30 mm thick including correction works with bc 50 mm thick and applying tack coat with bitumen emulsion before laying bc for resurf on existing surface and edge marking bet km 12.235 to km 19.985 on road diyalkhai-sinzwal

Read more
Providing, laying, spreading and comp of 30 mm thick bc consolidated incl tack coat and correction work with 30 mm thick consolidated bc along with road marking and road studs for resurf works between km 0.90 to km 24.36 on road old jnm and between k

Providing, laying, spreading and comp of 30 mm thick bc consolidated incl tack coat and correction work with 30 mm thick consolidated bc along with road marking and road studs for resurf works between km 0.90 to km 24.36 on road old jnm and between k

Read more
Bituminous concrete including tack coat and correction work with 30 and 40 mm thick consolidated bituminous concrete along with road marking for resurfacing works on various roads under 107 rcc/758 brtf under project

Bituminous concrete including tack coat and correction work with 30 and 40 mm thick consolidated bituminous concrete along with road marking for resurfacing works on various roads under 107 rcc/758 brtf under project

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise