Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Addition / Alteration To Shed No. 53 At 28 Ed Afs, Amla Building Works 🛠️ The E In C Branch Of The Military Engineer Services, Under The Central Government, Invites Bids For The Addition And Alteration Of Shed No. 53 Located At 28 Ed Afs, Amla Building Works. 📅 Bid Submission Deadline: May 15, 2024, 6:00 Pm Tender Fee: Inr 1000 Emd: Inr 141160 Interested Contractors Must Submit Detailed Bids, Including Technical Specifications, Cost Estimates, And A Timeline For Project Completion, Adhering To The Prescribed Tender Documentation Format. Keywords: Military Engineer Services, Central Government, Construction, Addition And Alteration, Shed No. 53, Amla Building Works, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Providing And Laying Of 30 Mm Thick (Consolidated) Bituminous Concrete Layer On Road Sector Between Km 15.00 To Km 42.00 At Different Stretches On Road Pithoragarh Tawaghat And Tack Coat With Bitumen Emulsion Over Existing Surface, Correction Work W
|
| Description |
Providing And Laying Of 30 Mm Thick (Consolidated) Bituminous Concrete Layer On Road Sector Between Km 15.00 To Km 42.00 At Different Stretches On Road Pithoragarh Tawaghat And Tack Coat With Bitumen Emulsion Over Existing Surface, Correction Work W
|
| Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
| Tender Id | 2024_MES_649867_1 |
|
Reference Number |
80635 |
| Tender Fee | 0 |
| EMD | 7.3 Lakh |
| Tender Value | - |
| Place | Pithoragarh-Tawaghat Road uttarakhand state |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=790362 |
| Start Date | May 19, 2025 15:30 |
| End Date |
Expired
24/05/2025
Expired 479 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing, laying, spreading and compaction of bc 30mm thick (consolidated) including cleaning, applying tack coat using bitumen emulsion between km 6pt00 to km 15pt328 on pithoragarh tawaghat road (part i), km 6pt00 to km 44pt00 on
Baijnath munsiyari road (part ii) for resurfacing including correction work for road pithoragarh tawaghat only in aor of 47 brtf and km 62pt00 to km 67pt68 on pithoragarh tawaghat road (partiii) for resurfacing incl correction work in aor of 765 brtf
Read moreMatigara-kurseong road chainage from 12.50 km to 15.00 km restoration of flank in stretches
Matigara-kurseong road chainage from 12.50 km to 15.00 km restoration of flank in stretches under darjeeling highway division in the district of darjeeling during the year 2023-24.
Read moreTreatment of 04 landslide locations ch 102pt66 km to ch 102pt885 km on pithoragarh tawaghat road and ch 4pt680 km ch 4pt880 km ch 4pt890 km ch 5pt250 km and ch 5pt733 km ch 5pt833 km in tawaghat ghatiabagarh section of nh 09 old nh 125 in the uk
Treatment of 04 landslide locations ch 102pt66 km to ch 102pt885 km on pithoragarh tawaghat road and ch 4pt680 km ch 4pt880 km ch 4pt890 km ch 5pt250 km and ch 5pt733 km ch 5pt833 km in tawaghat ghatiabagarh section of nh 09 old nh 125 in the uk
Read moreImprovement and painting work of tawaghat thanidhar motor road in assembly dharchula of district pithoragarh (km 11.00 to km 14.00) under state sector and 3 year maintenance work.
Improvement and painting work of tawaghat thanidhar motor road in assembly dharchula of district pithoragarh (km 11.00 to km 14.00) under state sector and 3 year maintenance work.
Read moreImprovement and painting work of tawaghat thanidhar motor road in assembly dharchula of district pithoragarh (km 6.00 to km 10.00) under state sector and 3 year maintenance work.
Improvement and painting work of tawaghat thanidhar motor road in assembly dharchula of district pithoragarh (km 6.00 to km 10.00) under state sector and 3 year maintenance work.
Read moreImprovement and painting work of tawaghat thanidhar motor road in assembly dharchula of district pithoragarh (km 1.00 to km 5.00) under state sector and 3 year maintenance work.
Improvement and painting work of tawaghat thanidhar motor road in assembly dharchula of district pithoragarh (km 1.00 to km 5.00) under state sector and 3 year maintenance work.
Read moreProviding, laying, spreading and comp of 30 mm thick bc consolidated incl tack coat and correction work with 30 mm thick consolidated bc along with road marking and road studs for resurf works between km 0.90 to km 24.36 on road old jnm and between k
Providing, laying, spreading and comp of 30 mm thick bc consolidated incl tack coat and correction work with 30 mm thick consolidated bc along with road marking and road studs for resurf works between km 0.90 to km 24.36 on road old jnm and between k
Read moreBt. renewal work on sumer to hathiyakhedi suakhedi atarikhejda road length 15.00 km.
Bt. renewal work on sumer to hathiyakhedi suakhedi atarikhejda road length 15.00 km.
Read moreProviding, laying, spreading and comp of 40 mm consolidated bc incl tack coat and correction work with bc including tack coat along with road marking resurfacing works between 0.00 to km 4.800 on road gangtok chungthang under 129 rcc in 758 brtf are
Providing, laying, spreading and comp of 40 mm consolidated bc incl tack coat and correction work with bc including tack coat along with road marking resurfacing works between 0.00 to km 4.800 on road gangtok chungthang under 129 rcc in 758 brtf are
Read moreSurfacing works on restored stretches bet km 36.100 and km 123.950 at different locations on oksrt
Supply and stacking of crushed stone chips 26.50 mm, stone chips 22.40 mm, stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.7 mm and stone dust at km 73.00 (hmp site) on orang-kalakthang-shergaon-rupa-tenga road in state of arunachal prades
Read moreof your Industry type