Tender Details
Particulars | Details |
---|---|
Title |
Independent Engineer Services For Oand M Period For The Work 4 Lane Bridge Across River Kosi And Including Its Approaches And Guide Bund And Afflux Bund From Km. 148.550 To Km. 159.185 In The State Of Bihar On Annuity Basis.
|
Description |
Independent Engineer Services For Oand M Period For The Work 4 Lane Bridge Across River Kosi And Including Its Approaches And Guide Bund And Afflux Bund From Km. 148.550 To Km. 159.185 In The State Of Bihar On Annuity Basis.
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_220575_1 |
Reference Number |
NIT No- 259/RO-PATNA/NHAI/2024-25 |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | NHAI, RO- Patna |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=245208 |
Start Date | December 20, 2024 18:40 |
End Date |
20/01/2025 ( Expired 138 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreIndependent engineering services for construction of four lane from sahebganj (design.ch. km 44.650) to areraj (design.ch. km. 82.200) section of nh139w in the state of bihar on hybrid annuity mode.
Independent engineering services for construction of four lane from sahebganj (design.ch. km 44.650) to areraj (design.ch. km. 82.200) section of nh139w in the state of bihar on hybrid annuity mode.
Read moreConstruction of iconic hybrid cable stayed and suspension bridge across krishna river on nh 167k design chainage km 87.360 to km 88.437 in the states of telangana and andhra pradesh on epc basis
Construction of iconic hybrid cable stayed and suspension bridge across krishna river on nh 167k design chainage km 87.360 to km 88.437 in the states of telangana and andhra pradesh on epc basis
Read moreRehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.
Read moreConstruction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire
Construction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire
Read moreEngagement of user fee agency on the basis of competitive bidding through e-tender bhitaha fee plaza at design km 201.150 for the use of 4 and more lane of varanasi to gorakhpur section of nh-29 in the state of uttar pradesh
Engagement of user fee agency on the basis of competitive bidding through e-tender bhitaha fee plaza at design km 201.150 for the use of 4 and more lane of varanasi to gorakhpur section of nh-29 in the state of uttar pradesh
Read moreConsultancy work for preparation of detailed project report for the widening and construction of 4-lane high level bridge in place of existing 2-lane bridge across ayad river and widening of 2-lane road under bridge (rub) as 4-lane (rub) below sh-32
Consultancy work for preparation of detailed project report for the widening and construction of 4-lane high level bridge in place of existing 2-lane bridge across ayad river and widening of 2-lane road under bridge (rub) as 4-lane (rub) below sh-32
Read moreProject management consultancy services for proof checking, construction supervision, quality assurance, quality control quality audit for the work of construction of 4 lane composite steel girder bridge on the pipeline road across fox sagar surplus nala under engineering procurement construction (epc)/turnkey basis.
Project management consultancy services for proof checking, construction supervision, quality assurance, quality control and quality audit for the work of construction of 4 lane composite steel girder bridge on the pipeline road across fox sagar surplus nala under engineering procurement construction (epc)/turnkey basis
Read moreof your Industry type