Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dial Type Gas Expansion Temperature Gauge / Thermometer
|
| Description |
|
| Organisation | NORTH EASTERN ELECTRIC POWER Corporation Limited | Ministry of Power |
| Tender Id | GEM/2024/B/5553282 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | October 28, 2024 18:02 |
| End Date |
Expired
13/11/2024
Expired 697 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Expansion of academic section 2 at 2nd floor of old opd block, nims
Expansion of academic section 2 at 2nd floor of old opd block, nims
Read moreDifferent sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Read moreProcurement of blast monitoring seismograph and digital thermometer with probe for gdk coal mine (no.2, 2a, and 5), rg-1 area
Procurement of blast monitoring seismograph and digital thermometer with probe for gdk coal mine (no.2, 2a, and 5), rg-1 area
Read moreExpansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)
Expansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)
Read moreSupply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas
Supply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas
Read moreOut sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type