Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Pressure And Temperature Gauges.
|
| Description |
Procurement Of Pressure And Temperature Gauges.
|
| Organisation | Department of Power | Punjab State Power Corporation Limited | GGSSTP, Roopnagar | P-2 |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 10800 |
| Tender Value | - |
| Place | Punjab |
| Link | Login to view |
| Start Date | October 06, 2026 17:30 |
| End Date |
Open
28/10/2026
15 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of pressure gauges lot-2
Supply of pressure gauges lot-2 for numaligarh refinery expansion project
Read moreSupply of pressure gauges lot - 02
Design, engineering, manufacturing, procurement of materials and bought out components, assembly at shop, inspection including inspection by tpia, testing at manufacturer works, packing, supply of pressure gauges as per mr
Read moreSpn/ b957-000-yi-mr-1100/ 208 pressure and temperature gauges for bina petchem and refinery expansion project (bprep)
Spn/ b957-000-yi-mr-1100/ 208 pressure and temperature gauges for bina petchem and refinery expansion project (bprep)
Read moreTubular level gauges 800 mm,tubular level gauges 1000 mm,tubular level gauges 1100 mm,tubular level gauges 1220 mm
Tubular level gauges 800 mm,tubular level gauges 1000 mm,tubular level gauges 1100 mm,tubular level gauges 1220 mm
Read moreSupply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas
Supply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas
Read moreTtps es circle instn ii removing cleaning flushing, and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators limit switches feedback
Ttps es circle instn ii removing cleaning flushing, and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators limit switches feedback
Read moreSupply and performance testing of vacuum gauges as per technical specifications
Supply and performance testing of vacuum gauges as per technical specifications
Read moreof your Industry type