Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm Unit I To Iv Dismantling Cleaning And Assembling Of Main Oil Tank Filters And Centrifuges Bowl Assembly During 2024 25 For A Period Of One Year From The Date Of Commencement
|
| Description |
Mtps I Tm Unit I To Iv Dismantling Cleaning And Assembling Of Main Oil Tank Filters And Centrifuges Bowl Assembly During 2024 25 For A Period Of One Year From The Date Of Commencement
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_502699_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 257/ 2024-25 |
| Tender Fee | 0 |
| EMD | 7900 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=597881 |
| Start Date | November 19, 2024 23:30 |
| End Date |
Expired
03/12/2024
Expired 684 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rendering para medical assistance at mtps ii dispensary through outsourcing for a period of 365 days from the date of commencement
Rendering para medical assistance at mtps ii dispensary through outsourcing for a period of 365 days from the date of commencement
Read moreMtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical
Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical
Read moreMtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Mtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreTtps es em iii rewinding of 415v ac 3 phase 1 2kw 700 rpm generator transformer cooler fan motors in unit iv v for the period of one year from the date of commencement of work
Ttps es em iii rewinding of 415v ac 3 phase 1 2kw 700 rpm generator transformer cooler fan motors in unit iv v for the period of one year from the date of commencement of work
Read moreof your Industry type