Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm I Dismantling Inspection And Overhauling Of Pennwalt Centrifuges 4 A 4 B In Unit Iv During Coh 2025 26
|
| Description |
Mtps I Tm I Dismantling Inspection And Overhauling Of Pennwalt Centrifuges 4 A 4 B In Unit Iv During Coh 2025 26
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_558107_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 84 / 2025-26 |
| Tender Fee | 0 |
| EMD | 1900 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=666567 |
| Start Date | May 15, 2025 00:00 |
| End Date |
Expired
28/05/2025
Expired 503 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Read moreMtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical
Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical
Read moreMtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Read moreMtps i tm unit ii overhauling of olctc system pump lhs and rhs inspection and cleaning of condenser cw box steam side hot well and olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve
Mtps i tm unit ii overhauling of olctc system pump lhs and rhs inspection and cleaning of condenser cw box steam side hot well and olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve etc
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreMtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main
Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main
Read moreTtps mechii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of
Ttps mechii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of
Read moreMtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during 2024 25
Mtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during 2024 25
Read moreMtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a and 4b in unit iv during aoh 2025 26
Mtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a and 4b in unit iv during aoh 2025 26
Read moreMtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 3a and 3b in unit iii during 2024 25
Mtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 3a and 3b in unit iii during 2024 25
Read moreof your Industry type