Tender Details

Particulars Details
Title
Spl Repairs To Water Pipelines From Deorali To Shyari Under Ge Gangtok
Description
Spl Repairs To Water Pipelines From Deorali To Shyari Under Ge Gangtok
Organisation Defence eProcurement Portal
Tender Id 2023_MES_630545_1
Reference
Number
8194/A/E8
Tender Fee 500
EMD 76000
Tender Value
Place GE Gangtok
Link https://defproc.gov.in
Start Date December 14, 2023 14:30
End Date

02/01/2024 ( Expired 549 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor

Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Read more
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Read more
E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp

E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp

Read more
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode

Construction of road kibithu kundao from km 0.000 to km 52.000&#x0d design length 0.000 to 19.557 kms green field alignment to nhsl&#x0d specifications under project udayak in anjaw district of arunachal&#x0d pradesh state on epc mode&#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise