Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Laying And Erection Of 2 Length Of 50 Mm Heavy Duty Pe 8 O Pipe For Water Supply To Coal Stock For Fire Fighting Purpose From Banwar Pipe Point At Topa Ocp Under Kuja Area.
|
Description |
Laying And Erection Of 2 Length Of 50 Mm Heavy Duty Pe 8 O Pipe For Water Supply To Coal Stock For Fire Fighting Purpose From Banwar Pipe Point At Topa Ocp Under Kuja Area.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_338093_1 |
Reference Number |
GM(K)/EnM/eTender/25-26/85 |
Tender Fee | 0 |
EMD | 9400 |
Tender Value | |
Place | GM UNIT KUJU |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=350482 |
Start Date | June 21, 2025 16:30 |
End Date |
01/07/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of upvc pipes 200 mm dia in 06 m length socket ended for irrigation water supply in light gray colour 0.4 mpa class-2 working pressure with solvent cement as per is 4985 2021 including proper stacking in central store at tube well division rke
Supply of upvc pipes 200 mm dia in 06 m length socket ended for irrigation water supply in light gray colour 0.4 mpa class-2 working pressure with solvent cement as per is 4985 2021 including proper stacking in central store at tube well division rke
Read moreProviding ,laying and fixing of gi pipe for fire fighting work around coal stock 7,7a and 11 at tetariakhar ocp under rajhara area.
Providing ,laying and fixing of gi pipe for fire fighting work around coal stock 7,7a and 11 at tetariakhar ocp under rajhara area.
Read moreDi, erection, dismantling of 6.6kv d/l feeder clear the area out sourcing patch old point power supply jocp patch 4000 gpm pump and installation of 10kva/6.6kv/220v, transformer for lighting purpose (b) di of 220v lt o/h line clear the
Di, erection, dismantling of 6.6kv d/l feeder clear the area out sourcing patch old point power supply jocp patch 4000 gpm pump and installation of 10kva/6.6kv/220v, transformer for lighting purpose (b) di of 220v lt o/h line clear the
Read moreWork of providing and laying 40 mm dia gi distribution pipe line for water supply from d 3 to swami vivekanand building at koyla nagar township bccl, under enm ws deptt. dhanbad.
Work of providing and laying 40 mm dia gi distribution pipe line for water supply from d 3 to swami vivekanand building at koyla nagar township bccl, under enm ws deptt. dhanbad.
Read moreSupply and fixing of high pressure fire fighting hose pipe/rubberized canvas hose pipe with delivery coupling for fire fighting at coal stock no. 18, 19, 23 under kdh ocp, nk area.
Supply and fixing of high pressure fire fighting hose pipe/rubberized canvas hose pipe with delivery coupling for fire fighting at coal stock no. 18, 19, 23 under kdh ocp, nk area.
Read moreProviding and laying water supply pipe, over head tank with distribution arrangement for community center near siva mandhir of village solada at balram ocp under hingula area.
Providing and laying water supply pipe, over head tank with distribution arrangement for community center near siva mandhir of village solada at balram ocp under hingula area.
Read moreProviding, lowering, laying and jointing d.i. and g.i. pipe line for improvement of water supply of newly development area in ward no. 17 bhal gaon. (3rd call)
Providing, lowering, laying and jointing d.i. and g.i. pipe line for improvement of water supply of newly development area in ward no. 17 bhal gaon. (3rd call)
Read moreLaying and erection of 2 length of 50 mm heavy duty pe 8o pipe for water supply to coal stock for fire fighting purpose from banwar pipe point at topa ocp under kuja area.
Laying and erection of 2 length of 50 mm heavy duty pe 8o pipe for water supply to coal stock for fire fighting purpose from banwar pipe point at topa ocp under kuja area.
Read more1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
Read moreLaying of 100mm dia di pipe for providing water supply connection from h.no.2-10-24/11 to 2-10-42/14 under machabollaram section, sd-i, o and m divn.no.xiii.
Laying of 100mm dia di pipe for providing water supply connection from h.no.2-10-24/11 to 2-10-42/14 under machabollaram section, sd-i, o and m divn.no.xiii.
Read moreof your Industry type